CENTRAL cooling and/or heating plants generate cooling and/or heating in one location for distribution to multiple locations in one building or an entire campus. Central cooling and heating systems are used in almost all types of buildings, but most commonly in very large buildings and complexes where there is a high density of energy use. This chapter covers plants with cooling and/or heating (referred to as central plants). They are especially suited to applications where maximizing equipment service life and using energy and operational workforce efficiently are important.
Good candidates for a central plant have significant loads and a designated mechanical space. Appendix G of ASHRAE Standard 90.1 shows that central plants are typical in buildings more than five floors high or greater than 150,000 ft2. Smaller buildings may use them for efficiency and control reasons, but the cost per square foot increases as compared to more typical systems. Building or facility types that commonly use central plants include
Campus environments with distribution to several buildings (described further in Chapter 12).
High-rise facilities
Large office buildings (typically over 150,000 ft2)
Large public assembly facilities, entertainment complexes, stadiums, arenas, and convention and exhibition centers
Urban centers (e.g., city centers/districts)
Shopping malls
Large condominiums, hotels, and apartment complexes
Educational facilities
Hospitals and other health care facilities
Industrial facilities (e.g., pharmaceutical, manufacturing)
Large museums and similar institutions
Locations where waste heat is readily available (result of power generation or industrial processes)
Larger systems where higher efficiency offsets the potentially higher first cost of a chilled-water system
This chapter addresses design alternatives that should be considered for central cooling and heating plants. Distribution system options and equipment are discussed when they relate to the central equipment, but more information on distribution systems can be found in Chapters 11 to 15.
1. SYSTEM CHARACTERISTICS
Central systems are characterized by large chilling and heating equipment located in one facility or multiple installations interconnected to operate as one. Equipment configuration and ancillary equipment vary significantly, depending on the facility’s use. Typically, central plants include water-chilling equipment, pumps, and water system specialty items. Boilers are often in a separate mechanical room to provide proper separation from the refrigeration equipment, as required by ASHRAE Standard 15. The central plant also typically includes cooling towers and pumps, if it is a water-cooled plant. See Chapter 1 for information on selecting a central cooling or heating plant.
The plant and equipment can be located as part of the facility, or in remote stand-alone plants. Also, different combinations of centralized and decentralized systems (e.g., a central cooling plant and decentralized heating and ventilating systems) can be used.
Chillers and boilers are available in different sizes, capacities, and configurations to serve a variety of building applications. Operating a few pieces of primary equipment (often with back-up equipment) gives central plants different benefits from decentralized systems (see Chapter 2).
Multiple types of equipment and fuel sources can be combined in one plant, but typically only in large plants. The heating and cooling energy may be a combination of electricity, natural gas, oil, coal, solar, geothermal, waste heat, etc. This energy is converted into chilled water, hot water, or steam that is distributed through the facility for air conditioning, heating, and processes. The operating, maintenance, and first costs of all these options should be discussed with the owner before final selection. When combining heating generation systems, it is important to note the presence of direct-firing combustion systems and chilled-water production systems using refrigerants, because ASHRAE Standard 15 requires most refrigerants to be isolated from combustion equipment for safety.
A central plant can be customized without sacrificing the standardization, flexibility, and performance required to support the primary cooling and heating equipment by carefully selecting ancillary equipment, automatic control, and facility management. Plant design can vary widely based on building use, life-cycle costs, operating economies, and the need to maintain reliable building HVAC, process, and electrical systems. These systems can require more extensive engineering, equipment, and financial analysis than do decentralized systems.
In large buildings with interior areas that require cooling at the same time perimeter areas require heating, one of several types of centralized heat reclaim units can meet both these requirements efficiently. Chapter 9 describes these combinations, and Chapters 11 to 15 provide design details for central plant systems. Using recovered energy for reheat at the zone level is a common use for lower-grade heat. It can significantly reduce the total energy use of buildings that commonly have simultaneous heating and cooling loads (e.g., hospitals, large hotels). Using recovered energy for reheat is one of the allowed exceptions in ASHRAE Standard 90.1 for simultaneous heating and cooling.
Central plants can be designed to accommodate both occupied/ unoccupied and constant, year-round operation. Maintenance can be performed with traditional one-shift operating crews, but may require 24 h coverage. Higher-pressure steam boiler plants (usually greater than 15 psig) or combined cogeneration and steam heating plants require multiple-operator, 24 h shift coverage.The need for full-time operating personnel or certified operating engineers is typically defined by the authorities having jurisdiction (AHJs).
Simultaneous primary cooling and heating can be provided at all times, independent of the operation mode of equipment and systems beyond the central plant.
Using larger but fewer pieces of equipment generally reduces the facility’s overall operation and maintenance costs. It also allows wider operating ranges and more flexible operating sequences.
A centralized location minimizes restrictions on servicing accessibility.
Energy-efficient design strategies, energy recovery, thermal storage, and energy management can be simpler and more cost effective to implement.
Multiple energy sources can be used in central plants, providing flexibility and leverage when purchasing fuel and in the event of shortages of one or more fuel sources.
Standardizing equipment can be beneficial for redundancy and stocking replacement parts. However, strategically selecting different-sized equipment for a central plant can provide better part-load capability and efficiency.
Standby capabilities (capacity/redundancy) and back-up fuel sources can be more easily added to equipment and plant when planned in advance.
Equipment operation can be staged to match load profile and can allow select pieces of equipment to be taken offline for maintenance.
A central plant and its distribution can be economically expanded to accommodate future growth (e.g., adding new equipment to the plant or new buildings to the service group).
Load diversity can substantially reduce the total installed equipment capacity requirement.
Submetering secondary distribution can allow individual billing of cooling and heating uses outside the central plant.
Major vibration and sound-producing equipment can be grouped away from occupied spaces, making acoustic and vibration controls simpler. Acoustical treatment can be applied in a single location instead of many separate locations.
Issues such as cooling tower plume and plant emissions are centralized, allowing a more economic and aesthetically acceptable solution.
New or replacement equipment of the required capacity may not be readily available, resulting in long lead time for production and delivery.
Equipment may be more complicated than decentralized equipment, and thus require more knowledgeable equipment operators.
A central location within or adjacent to the building(s) served is needed.
Additional equipment room height may be needed for the larger central plant equipment.
Depending on the fuel source, large underground or surface storage tanks may be required on site. If coal is used, space for storage bunker(s) will be needed.
Access may be needed for large deliveries of fuel (oil, propane, wood/biomass, or coal).
Fossil-fuel-fired heating plants require a chimney or flue and possibly special emission treatment, permits, and/or monitoring.
Multiple equipment manufacturers are required when combining primary and ancillary equipment in a common facility.
System control logic may be complex.
First costs can be higher compared to alternatives with rooftop units (RTUs), water-source heat pumps (WSHPs), self-contained equipment, and other systems.
Special permitting may be required.
Safety requirements are increased.
A large pipe distribution system may be necessary (which may actually be an advantage for some applications).
Cooling and Heating Loads
Design cooling and heating loads are determined by considering individual and simultaneous loads. That is, the simultaneous peaks or instantaneous load for all areas served or a block of buildings served by the HVAC and/or process load is less than the sum of the individual peak cooling and heating loads (e.g., buildings do not receive peak solar load on the east and west exposures at the same time). The difference between the sum of the space design loads and system peak load, called the diversity factor, can be as little as 5% less than the sum of individual loads (e.g., 95% diversity factor) or can represent a more significant reduction of the plant load (e.g., 45% diversity factor), as is possible in multiple-building applications. Computerized load calculation programs can be used to model different schedules (occupancy, lighting, etc.) with peak thermal loads, to determine appropriate diversity factors. The peak central plant load is typically based on a diversity factor, reducing the total installed equipment capacity serving larger building cooling and heating loads. The design engineer should evaluate the full point-of-use load requirements of each facility served by the central system. It is important to review applicable codes and requirements of the local authority having jurisdiction (AHJ), which may limit the use of diversity factors.
Opportunities for improving energy efficiency include
Using multiple chillers or boilers can provide better part-load operation, with a wider range of operation without cycling off and on. Using correctly sized equipment is imperative to accurately provide the most flexible and economical sequencing of equipment. Modeling programs or spreadsheets are an excellent way to compare different staging sequences. Controls can handle a greater number of sequences, but controls for special staging will have a higher first cost. Installing more units to deliver the same capacity that can be delivered by a single piece of equipment typically increases the cost and space required. This needs to be checked against the staging and redundancy requirements that multiple units can provide. If multiple units are to be used, the designer must verify that the expected load profiles fit the full load capabilities of one, two, or more of the units installed.
Rightsizing equipment allows it to operate closer to peak efficiency, as opposed to incorrectly sized units that are forced to operate at low loads for extended periods of time. It also saves on the cost of installing extra capacity.
For central chiller plants, consider using variable-frequency drives (VFDs) on chillers. Multiple VFD installations on chillers allow more flexibility in control and energy efficiency of chiller plant operation. Remember that part-load efficiency increases when the required lift decreases. This occurs when the condensing temperature is lowered (cooler condensing fluid) or the discharge chilled-water temperature is raised.
Staging cooling towers with the chillers can increase efficiency and reliability by using as much cooling tower surface and fans as possible. Coordinating equipment flow (maximum and minimum at various stages) characteristics is now required by ASHRAE Standard 90.1 (as of 2013).
Using exchangers to transfer free or waste energy from one source to another can provide significant savings. This can also allow mechanical equipment to unload or turn off completely on nonpeak days. Examples include recovering condenser water for reheat, recovering energy from a process load to provide free heat, or preheating domestic or laundry water.
Discrete loads (e.g., server rooms) may be best served by an independent system, depending on the load profile of the central plant; a small, independent system, designed for the discrete load, can be the most cost-effective approach to handle the 24/7 server room load while allowing the primary HVAC system to shut off for a significant number of unoccupied hours. Central plants may not be able to reliably serve a small, discrete load. For example, a 2000 ton chiller plant serving a large office facility could be selected with two 1000 ton chillers. An independent computer room server has a year-round 20 ton load. Operating one 1000 ton chiller, plus towers and pumps, at less than 100 tons reliably would be extremely inefficient and possibly detrimental. Serving the discrete load independently allows the designer flexibility to evaluate the chiller plant independent of individual subsystems that may have very different schedules from the main plant.
Peak cooling load time is affected by outdoor ventilation, outdoor dry- and wet-bulb temperatures, hours of occupancy, interior equipment heat gain, and relative amounts of north, east, south, and west exposures. For typical office or classroom buildings with a balanced distribution of solar exposures, the peak usually occurs on a midsummer afternoon when the west solar load and outdoor dry-bulb temperature are at or near concurrent maximums. The peak cooling period can shift if ventilation rates and internal load profiles change significantly, as in a restaurant or high-rise residential building.
Building occupancy diversity can significantly affect the overall diversity factor. For example, in a system serving a high school, the peak cooling period for a classroom is different from that for the administration offices. Planning load profiles at academic facilities requires special consideration. Unlike office and residential applications, educational facilities typically have peak cooling loads during late summer and early fall.
Peak heating load has less opportunity to accommodate a diversity factor, because equipment is most likely to be selected based on the sum of individual heating loads when the spaces are not being used. This load may often occur when the building must be warmed after an unoccupied weekend setback period. Peak demand might occur during unoccupied periods when outdoor temperatures are coldest and there is little internal heat gain, or during occupied times if a significant amount of outdoor air must be preconditioned. To accommodate part-load conditions and energy efficiency, variable flow may be the best economical choice. It is important for the designer to evaluate plant operation and system use. Boiler heating loads can typically be handled with variable flow by using primary/secondary pumping. Some boilers (e.g., condensing) can also be used in variable primary pumping arrangements. Chapter 32 discusses this in greater detail.
The designer needs to evaluate the security requirements as part of the design, commissioning, and maintenance plans for the building. The team should evaluate the building for security risks in terms of intentional (terrorist) acts, accidental events, and natural disasters. Central plants can make it easier to isolate parts of the HVAC system, but components outside the mechanical room or outside the building (e.g., air intakes, power and controls connections) may be of concern.
Special sequences of operation can provide ventilation and isolation during a security event. HVAC and power redundancy, increased filtration, and sensors are typically included in the security plan. Chapter 61 of the 2019 ASHRAE Handbook—Applications has more detail on developing design, plans, and planned responses to these types of events. Depending on the building function, location, and occupants, the security plan may change. It is very important to remember that early planning and the use of commissioning can reduce the risk of harm to occupants.
The flow configuration of a central system is based on use and application. Primary variable flow uses variable flow through the primary equipment (chiller or heating device) and directly pumps the water to the loads. Variable primary flow typically uses two-way automatic control valves at terminal equipment and variable-frequency drive (VFD) pumping (Figure 1). An older version of variable flow uses distribution pressure control with a bypass valve (Figure 2). This option keeps full flow in the chiller or boiler, but sacrifices the savings of the VFD on the pumps. Both methods control system pressure, usually at the hydraulically most remote point (last control valve and terminal unit) in the water system.
The design engineer should work with the equipment manufacturer to ensure minimum equipment flow rates are maintained throughout the building load profile, and to determine whether any additional components or ancillary equipment is required. Chillers are typically selected with higher water velocities (6 to 8 fpm) and water pressure drops at full load in the evaporator to provide improved turndown on the water flow while maintaining the required minimum equipment flow. The chilled-water pumps are not dedicated to specific chillers/boilers, but run off of a common header to allow the chillers to operate over a wide range of flows (Figure 1). The valve in the bypass line is closed until system flow drops to the minimum flow of the operating chiller/boiler(s). Flow transitions when staging a chiller off and on are the most critical. Check each chiller’s minimum and maximum flow to ensure that the pumps can maintain the required flow rate range from minimum to 100% load. Multiple chillers or those with higher turndown ratios make this easier. Avoid variable primary systems where there are poor controls or limited operator training.
Constant primary/variable secondary flow hydraulically decouples the primary production system (chilled- or heating-water), which is commonly constant flow, from the secondary distribution. A variable-flow secondary piping system distributes the chilled or heating medium to the point of use (Figures 3 and 4). This is probably the most common pumping flow arrangement in use, and allows for easy redundancy with all primary components and easy isolation of units as they cycle off or need to be serviced.
Primary/secondary pumping maintains constant design flow in each chiller (or boiler) during operation. The secondary (load) pumps vary their flow rates to match system demand by maintaining a set pressure in the loop. A decoupler line between the primary and secondary loops allows the two sets of pumps to operate at different flow rates. The constant-flow primary helps because many chillers and boilers require full flow or are limited in the amount of flow reduction they can handle.
The primary pumps are sized for the chiller flows and pressure drops associated with the central plant. The secondary pumps are selected for the building flows and their pressure drops, plus the secondary distribution system, which typically exceeds that of the primary loop. This allows for saving on the largest part of the pumping energy by varying the flows on the building loads.
Improved chiller controls and lower VFD costs have made VFDs on primary pumps a flexible and economical way to tune chiller flow without trimming pump impellers or using a throttling valve. Condenser pumps generally need less head capability than the secondary pumps because the towers are typically close. VFDs can be used on these pumps, but they are typically smaller pumps. The designer should be careful when reducing flow on the towers, which can increase the return tower water temperature and chiller energy use. Also, varying flow across the cooling tower can greatly affect tower performance.
In Figure 3, multiple tower cells have been selected to match the number of chillers. Note that running 50% of the water through both cells with each fan at 50% speed uses less energy than one tower at 100% flow and fan speed. The designer should confirm that the towers can handle reduced flow (fairly common with newer towers).
When using either primary/secondary or primary variable-flow designs, the engineer should understand the design differences between the use of two- and three-way modulating valves (see Chapter 46).
Variable-flow designs modulate chilled- or heating-water flow through the distribution loop. As terminal units satisfy demand, a two-way valve modulates toward closed, causing the system pressure to increase above the design point. To compensate, a VFD reduces pump speed, thereby reducing flow and pressure to the control point. Pump speed is usually controlled by a differential pressure sensor. Other recent technologies sense valve positions throughout the system and optimize flow accordingly. As the pressure differential increases (the result of valves closing), the VFD reduces speed to maintain the pressure set point. As system demand requires increased flow, the control valves modulate open, reducing system differential pressure. The reduction in differential pressure causes the VFD to increase pump speed to maintain the pressure set point and meet system flow demand.
Care should be taken during design to ensure minimum flow is achieved in the secondary loop under part-load operation throughout the system. When selecting the distribution system pump, ensure distribution flow does not exceed production flow, which could cause a temperature drop in the secondary loop if flow exceeds demand, leading to low ΔT syndrome (see, e.g., Taylor [2002]). The engineer should evaluate operational conditions at part load to minimize the potential for this to occur
With primary variable-flow, a single set of pumps modulates the primary chilled- or heating-water flow, using a VFD to control pump speed. Primary variable-flow systems use modulating two-way control valves across each heat transfer device (as in the primary/secondary system). Chillers and boilers have minimum water flow rates that must be maintained to ensure proper operation. A bypass or other method to maintain minimum flows must be installed if the minimum system loads can be less than the minimum equipment limits.
An older design, which has been used for many years, is a straight constant-volume primary system. Hydronic pumps distribute water through the energy equipment and to the point of use. Both pumping energy and distribution flow are constant. This design is best suited to stable process loads, or may be seen in older systems that were installed before VFDs were common. Constant flow generally requires three-way valves to maintain the minimum required flow rate through generating equipment and not over pump the coils and loads. These systems are usually much more expensive to operate and, therefore, less attractive in central HVAC systems. Take care with this type of design, because many current energy codes (including ASHRAE Standard 90.1) do not allow using pump motors without variable-frequency drives.
Energy Recovery and Thermal Storage
Energy recovery and thermal storage strategies can be applied to a central cooling and heating plant. See ASHRAE Standard 90.1 for systems and conditions requiring energy recovery. Water-to-water energy recovery systems are common and readily available. Thermal storage using water or ice storage can be adapted to central plants. See Chapter 26 in this volume and Chapters 35 to 37 and 42 in the 2019 ASHRAE Handbook—HVAC Applications for more information on energy-related opportunities. Thermal energy storage (TES) systems may offer strategies for both part-load and peak-load energy reduction. Base-loading plant operation for a more flat-line energy consumption profile of a large plant, for example, may help reduce energy costs. Thermal energy storage of chilled water, ice, or heating water offers a medium for capacity redundancy, with potential reductions in both heating and cooling infrastructure equipment sizing.
Primary Refrigeration Equipment
Chillers are the major cooling equipment in central plants. They chill water or other low-temperature fluid, which is then pumped throughout the buildings served. Chillers vary in type and application, and fall into two major categories: (1) vapor-compression refrigeration (compressorized) chillers, and (2) absorption-cycle chillers. The chiller plant may have either, or a combination of, these machine types. Cooling towers, air-cooled condensers, evaporative condensers, or some combination are also needed to reject heat from this equipment. Energy for the prime driver of cooling equipment may also come from waste heat from a combined heat and power (CHP) system or other energy-using system that would normally reject heat to the atmosphere. Chapters 38 and 43 discuss refrigeration equipment, including the size range of available equipment.
Compressorized chillers feature scroll, helical rotary (screw), and centrifugal compressors, which may be driven by electric motors; natural gas-, diesel-, or oil-fired internal combustion engines; combustion turbines; or steam turbines. Compressor selection typically depends on capacity, first-cost budget limitations, and life-cycle cost.
Compressors are a part of the chiller that also includes the evaporator, condenser, safety and operating controls, and possibly a VFD to control the compressor driver. Reciprocating and helical rotary compressor units can be field assembled and include air- or water-cooled (evaporative) condensers designed for remote installation. Centrifugal compressors are usually included in larger packaged chillers, though they can be field erected on very-large-capacity chiller systems. Chillers require heat rejection equipment that can be unit mounted or remote, as well as air or water cooled. Chapter 38 has more detailed information about compressors.
Absorption chillers may be single or double effect. These terms refer to the number of times the solution is distilled, with double effect typically being higher capacity and more efficient, but using more energy than single effect. Like centrifugal chillers, absorption chillers require cooling towers to reject heat. Absorption chillers use a lithium bromide/water cycle in which the lithium bromide/water solution is the refrigerant. They are generally available in the following configurations: (1) natural gas direct fired, (2) indirect generated by low pressure steam or hot water, (3) indirect generated by high-pressure steam or high-temperature hot water, and (4) indirect generated by hot exhaust gas. Chapter 18 of the 2018 ASHRAE Handbook—Refrigeration discusses absorption air-conditioning and refrigeration equipment in more detail.
Ancillary Refrigeration Equipment
Ancillary equipment for central cooling plants consists primarily of heat-rejection equipment (air-cooled condensers, evaporative condensers, and cooling towers), pumps (primary, secondary, and tertiary), and heat exchangers (water-to-water). For more detailed information, see Chapters 26, 39, 40, and 42 to 47. As part of a packaged air-cooled chiller, air-cooled condensers pass outdoor air over a dry coil to condense the refrigerant. This can result in a higher condensing temperature than a water-cooled condenser would provide, and thus a higher power input at peak condition (though peak time may be relatively short over a 24 h period). Newer designs for air-cooled chillers can offer larger condenser surfaces to provide efficiencies closer to those of water-cooled units without the requirement for a cooling tower. Air-cooled condensers are popular with scroll and screw compressors, which can handle a wide range of ambient air temperatures. They generally have lower maintenance requirements, but incur a penalty for using the dry-bulb temperature as opposed to the wet-bulb temperature used by water-cooled equipment. Air-cooled equipment may be appropriate in high-wet-bulb environments, because cooling tower supply water temperature is a function of the wet-bulb temperature. They are also more common in smaller systems and in cooler climates that require more freeze protection and have lower peak temperatures.
Evaporative condensers pass outdoor air over coils sprayed with water, thus taking advantage of the heat that is absorbed in the evaporation process to lower the condensing temperature. Freeze prevention and close control of water treatment are required for successful operation. The lower power consumption of the refrigeration system and much smaller footprint of the evaporative condenser are gained at the expense of the cost of water and water treatment used and increased maintenance cost.
Cooling towers provide heat rejection by passing outdoor air through an open condenser return water spray to achieve adiabatic cooling performance. Either natural or mechanical-draft cooling towers or spray ponds can be used; the mechanical-draft tower (forced draft, induced draft, or ejector) can be designed for most conditions because it does not depend on wind. Cooling tower types and sizes range from packaged units to field-erected towers with multiple cells in unlimited sizes. Location of cooling towers should consider issues such as reingestion or short-circuiting of discharge heat rejection air, tower plume, proximity to outdoor air intakes, and the effect of drift on adjacent roadways, buildings, and parking lots. As with evaporative condensers, freeze protection may be required. Water treatment is necessary for successful operation to prevent scaling, biological growth (e.g., Legionella), and to prevent corrosion. More detail on cooling towers can be found in Chapter 14.
Makeup water subtraction meters should be evaluated for both evaporative condensers and cooling towers by the design engineer or owner. In many areas, sewage costs are part of the overall water bill, and most domestic water supplied to a typical facility goes into the sewage system. However, evaporated condenser water is not drained to sewer, and if a utility-grade meter is used to measure the difference between makeup and blowdown water quantity, potential savings can be available to the owner for water not discharged into the sewer. Metering should be evaluated with chilled-water plants, especially those in operation year-round. Consult with the water supplier to identify compliance requirements. Consider piping cooling tower water blowdown and drainage (e.g., to remove dissolved solids or allow maintenance when installing subtraction meters) to the storm drainage system, but note that environmental effects of the water chemistry must be evaluated before taking this step. Where chemical treatment conditions do not meet environmental outfall requirements, drainage to the sanitary system may still be required unless prefiltration can be incorporated.
Water pumps move both chilled and condenser water to and from the refrigeration equipment and associated ancillary equipment. Different pumping arrangements can provide operational savings associated with variable speed pumps, but ways to address application issues such as equipment staging or low ΔT syndrome should be considered. See Chapter 44 for additional information on centrifugal pumps, and Chapters 12 to 14 for system design.
Pumps should be headered to allow them to operate with any (as shown in Figures 1 to 3). Dedicating pumps to a chiller boiler or tower cell reduces redundancy and limits flow options to equipment.
Heat exchangers provide both operational and energy recovery cost-saving opportunities for central cooling plants. Operational opportunities often involve heat transfer between building systems that must be kept separated because of different pressures, media, cleanliness, etc. For example, heat exchangers can thermally link a low-pressure, low-rise building system with a high-pressure, high-rise building system. Heat exchangers can also transfer heat between chemically treated or open, contaminated water systems and closed, clean water systems (e.g., between a central cooling plant chilled-water system and a highly purified, process cooling water system, or potentially dirty pond water and a closed-loop condenser water system).
To conserve energy, water-to-water heat exchangers can provide water-side economizer opportunities. When outdoor conditions allow, condenser water can cool chilled water through a heat exchanger, using the cooling tower and pumps rather than a compressor. This approach should be considered when year-round chilled water is needed to satisfy a process load, or when an air-side economizer is not possible because of design requirements or limitations (e.g., space humidity requirements, lack of space for the required ductwork).Water-side economizers can also save on humidification costs in cold, dry climates by reducing the percentage of cold, dry outdoor air delivery to the building from air-side economizers.
Plant Controls. Direct digital control (DDC) systems should be considered for control accuracy and reliability. Temperature, flow, and energy use are best measured and controlled with modern DDC technology. Electric actuation is most common. Pneumatic actuation might be considered where torque or rapid response of powered actuation is required; medium-pressure air supply (typically 30 to 60 psig) is best. Consider using programmable logic controllers (PLCs) for plants where future expansion/growth is a possibility and changes to DDC controls would be cost prohibitive. Smaller plants can use the onboard chiller control panel, providing a simplified control system at a lower installed cost.
Codes and Standards. Specific code requirements and standards apply when designing central cooling plants. For cooling equipment, refer to ASHRAE Standard 15; Chapter 51 of this volume provides a comprehensive list of codes and standards associated with cooling plant design, installation, and operation. ASHRAE Standard 90.1, the International Energy Conservation Code® (IECC®; ICC [2018]), or local energy standards typically govern minimum equipment efficiencies, acceptable control sequences, economizer use, and other details. Follow manufacturers’ recommendations and federal, state, and local codes and standards.
Primary Heating Equipment
Boilers are the major heating equipment used in central heating plants. They vary in type and application, and include combined heat and power (CHP) equipment and waste heat boilers. Chapter 32 discusses boilers in detail, including the size ranges of typical equipment.
A boiler adds heat to the working medium, which is then distributed throughout the building(s) and/or campus. The working medium may be either water or steam, which can further be classified by temperature and pressure range. Steam, often used to transport energy over long distances, is converted to low-temperature hot water in a heat exchanger near the point of use. Although steam is an acceptable medium for heat transfer, low-temperature hot water is the most common and a more uniform and more easily controlled medium for providing heating and process heat (e.g., heating water to 200°F for heating and up to 140 to 160°F for domestic hot water). Elevated steam pressures and high-temperature hot-water boilers are also used. Both hot-water and steam boilers have the same type of construction criteria, based on operating temperature and pressure.
A boiler may be purchased as a package that includes the burner, fire chamber, heat exchanger section, flue gas passage, fuel train, and necessary safety and operating controls. Cast-iron and water-side boilers can be field-assembled, but fire-tube, scotch marine, and waste-heat boilers are usually packaged units.
Energy Sources. The energy used by a boiler (i.e., its fuel source) may be electricity, natural gas or propane, oil, coal, or combustible waste material, though natural gas and fossil-fuel oil (No. 2, 4, or 6 grade) are most common, either alone or in combination. Selecting a fuel source requires a detailed analysis of energy prices and availability (e.g., natural gas and primary electrical power). The availability of fuel oil or coal delivery is affected by road access and storage for deliveries.
Energy for heating may also come from waste heat from a CHP system. Plant production efficiency is improved when waste heat can be reclaimed and transferred to a heat source. A heat recovery generator can be used to convert the heat byproduct of electric generation to steam or hot water to meet a facility’s heating needs when the thermal load meets or exceeds the heat rejection capacity of the electric generation. This can help with cost-effective plant operation.
Additionally, attention to the design of an efficient and maintainable condensate return system for a central steam distribution plant is important. A well-designed condensate return system increases overall efficiencies and reduces both chemical and makeup water use.
Codes and Standards. Specific code requirements and standards apply when designing central heating boiler plants. It is important to note that for some applications (e.g., high-pressure boilers) and in some locations, continuous attendance by licensed operators is required for the area of the heating surface. Operating cost considerations should be included in determining such applications. Numerous codes, standards, and manufacturers’ recommendations need to be followed. Refer to Chapter 51 for a comprehensive list of codes and standards associated with this equipment, plant design, installation, and operation, and consult local or state fuel gas code requirements.
Ancillary Heating Equipment
Steam Plants. Boiler feed equipment, including the receiver(s) and associated pump(s), serve as a reservoir for condensate and makeup water waiting to be used by the steam boiler. The boiler feed pump provides system condensate and water makeup back to the boiler on an as-needed basis, at the delivery pressure of the steam supply.
Deaerators help eliminate oxygen and carbon dioxide from the feed water or steam to reduce the corrosive and detrimental effects of those contaminants (see Chapter 50 of the 2019 ASHRAE Handbook—HVAC Applications for more information).
Chemicals can be fed using several methods or a combination of methods, depending on the chemical(s) used (e.g., chelants, amines, oxygen scavengers).
Surge tanks are also applicable to steam boiler plants to accommodate large quantities of condensate water return and are primarily used where there is a rapid demand for steam (e.g., morning start-up of a central heating plant).
See Chapter 11 for more information on steam systems.
Hot-Water Plants. Ancillary equipment associated with central hot-water heating plants consists primarily of pumps and possibly heat exchanger(s). Water pumps move hot-water supply and return to and from the boiler equipment and associated ancillary equipment. See Chapter 44 for additional information on centrifugal pumps, as well as Chapters 11 to 13 and Chapter 15 for system design.
Heat Exchangers. Heat exchangers offer operational and energy recovery opportunities for central heating plants. Operational opportunities for heat exchangers involve combining steam system heating delivery capabilities with hot-water heating system supply and control capabilities.
Air-to-water and water-to-water heat exchangers provide opportunities for economizing and heat recovery in a central heating plant (e.g., flue gas exhaust heat recovery and boiler blowdown heat recovery).
For more detailed information on ancillary equipment, see Chapters 31 to 33 and Chapter 35.
The major piping in a central cooling plant can include, but is not limited to, chilled-water, condenser water, city water, natural gas, fuel oil, refrigerant, vent, and drainage systems. For a central steam heating plant, the major piping includes steam supply, condensate return, pumped condensate, boiler feed, city water (and/or softened or otherwise treated water), natural gas, fuel oil, vent, and drainage systems. For a central hot-water heating plant, it includes hot-water supply and return, city water, natural gas, fuel oil, vent, and drainage systems. In the 2017 ASHRAE Handbook—Fundamentals, see Chapter 22 for information on sizing pipes, and Chapter 38 for identification, color-coding, abbreviations, and symbols for piping systems.
Design selection of cooling and heating temperature set points (supply and return water) can affect first and operating costs. Water systems with a large temperature difference between supply and return water have lower flow requirements and can allow smaller pipe sizing and smaller valves, fittings, and insulation, which can lower installation cost. However, these savings may be offset by the larger coils and heat exchangers at the point of use needed to accomplish the required heat transfer. A similar design strategy can be achieved by reviewing the steam pressure differential.
Determining the optimum cooling and heating water supply and return temperatures requires design consideration of equipment performance, particularly the energy required to produce the supply water temperature. Although end users set water temperatures, the colder the cooling water, the more energy is needed by the chiller, and conversely, the warmer the return water, the less energy is consumed by the chiller. Similar issues affect hot-water supply temperature and steam operating pressure. Supply water reset may be used when peak capacity is not needed, potentially reducing energy consumption. This reduces chiller power input, but those savings may be offset by increased pump power input due to higher water flows required to achieve the needed capacity. Also, raising chilled-water temperatures diminishes the latent removal capacity of cooling and dehumidification equipment, and may adversely affect control of interior humidity.
Energy implications for the whole system must be considered. The design engineer should consider using higher temperature differences between supply and return to reduce the pump energy required by the distribution system, for both heating and chilled-water systems. Additionally, central plant production systems (e.g., boilers, steam-to-heating-water converters, chillers) operate more efficiently with higher return water temperatures.
During conceptual planning and design, or as early in design as possible, the engineer should evaluate the type(s) of facilities (existing and planned future) to which the central system will deliver service. When using variable-flow distribution with a constant design temperature differential between the supply and return medium, it is critical to avoid low ΔT syndrome (see, e.g., Taylor [2002]). The engineer should attempt to ensure this condition is minimized or avoided, or at minimum, perform due diligence to make the owner aware of the potential shortfalls where this is allowed to occur. With existing constant-flow/variable-temperature systems, take measures to avoid losing the conceptual design strategy of a variable-flow/constant-temperature split. Examples of connection strategies that are less costly than full renovation of a connected facility are (1) return recirculation control, to maintain a design temperature difference across a facility connection, or (2) separation of primary distribution supply from the secondary facility connection by a plate-and-frame heat exchanger with a control valve on the primary return controlled by the secondary supply to the facility. If reduction of temperature differential is allowed, increased flow of the medium through the distribution system will be required to accomplish the same capacity. This increase in flow increases pump power and chiller plant energy, compromising the available capacity and operation of the system.
Consider hydraulically modeling the cooling and heating media (chilled water, heating water, steam, domestic water, natural gas, etc.). With an emphasis on centralizing the source of cooling and heating, a performance template can be created for large plants by computerized profiling of cooling and heating delivery. Hydraulic modeling provides the economic benefits of predesigning the built-out completed system before installing the initial phase of the project. The model also helps troubleshoot existing systems, select pumps, project energy usage, and develop operation strategy.
Energy conservation and management can best be achieved with computerized design and facility management resources to simulate delivery and then monitor and measure the actual distribution performance.
5. SOUND, VIBRATION, SEISMIC, AND WIND CONSIDERATIONS
Proper space planning is key to sound and vibration control in central plant design. For example, central plants are frequently located at or below grade. This provides a very stable platform for vibration isolation and greatly reduces the likelihood of vibration being transmitted into the occupied structure, where it can be regenerated as sound. Also, locating the central ventilation louvers or other openings away from sound- and vibration-sensitive areas greatly reduces the potential for problems in those areas. As a guide, maintain free area around louvers as specified in ASHRAE Standard 15.
Vibration and sound transmitted both into the space served by the plant and to neighboring buildings and areas should be considered in determining how much acoustical treatment is appropriate for the design, especially if the plant is located near sensitive spaces such as conference rooms, sleeping quarters, or residences. See the section on Space Considerations for further discussion of space planning.
Acoustics must also be considered for equipment outside the central plant. For example, roof-mounted cooling tower fans sometimes transmit significant vibration to the building structure and generate ambient sound. Many communities limit machinery sound pressure levels at the property line, which affects the design and placement of equipment. See Chapter 49 of the 2019 ASHRAE Handbook—HVAC Applications for more detailed information on sound and vibration.
Depending on code requirements and the facility’s location with respect to seismic fault lines, seismic bracing may be required for the central plant equipment and distribution systems. For instance, a hospital located in a seismically active area must be able to remain open and operational to treat casualties in the aftermath of an earthquake. Additionally, outdoor equipment in some areas needs appropriate bracing for wind loads. This is particularly apparent in critical operations facilities in areas susceptible to hurricanes or tornadoes. Most building codes require that measures such as anchors and bracing be applied to the HVAC system. Refer to the local authority responsible for requirements, and to Chapter 56 of the 2019 ASHRAE Handbook—HVAC Applications for design guidance.
In the very early phases of building design, architects, owners, and space planners often ask the engineer to estimate how much building space will be needed for mechanical equipment. The type of mechanical system selected, building configuration, and other variables govern the space required, and many experienced engineers have developed rules of thumb to estimate the building space needed. Although few buildings are identical in design and concept, some basic criteria apply to most buildings and help approximate final space allocation requirements. These space requirements are often expressed as a percentage of the total building floor area; the combined mechanical and electrical space requirement of most buildings is 6 to 9% of total building area.
Space for chillers, pumps, and towers should not only include installation footprints but should also account for adequate clearance to perform routine and major maintenance. Generally, 4 ft service clearance (or the equipment manufacturer’s minimum required clearance, whichever is greater) around equipment for operator maintenance and service is sufficient. For chillers and boilers, one end or side of the equipment should be provided with free space, to allow for tube pull clearance. In many cases, designers provide service bay roll-up doors or removable ventilation louvers (if winter conditions do not cause freeze damage issues) to allow tube access. Overhead service height is also required, especially where chillers are installed. Provision for 20 ft ceilings in a central plant is not uncommon, to accommodate piping, component removal, and service clearance dimensions.
Plant designs incorporating steam supply from a separate central boiler plant may use steam-to-heating-water converters and the heating distribution equipment (e.g., pumps) along with the chilled-water production equipment and distribution infrastructure. Where a boiler installation and associated heating distribution equipment and appurtenances are required, the plant’s physical size increases to account for the type of boiler and required exhaust emissions treatment. Generally, for central heating plants, steam or heating water and chilled-water production systems must be separated during design, which may further increase the overall footprint of the plant. (Refer to ASHRAE Standard 15 for limitations.)
The arrangement and strategic location of the mechanical spaces during planning affects the percentage of space required. For example, the relationship between outdoor air intakes and loading docks, exhaust, and other contaminating sources should be considered during architectural planning. The final mechanical room size, orientation, and location are established after discussion with the architect and owner. The design engineer should keep the architect, owner, and facility engineer informed, whenever possible, about the HVAC analysis and system selection. Space criteria should satisfy both the architect and the owner or owner’s representative, though this often requires some compromise. The design engineer should strive to understand the owner’s needs and desires and the architect’s vision for the building, while fully explaining the advantages, disadvantages, risks, and rewards of various options for mechanical and electrical room size, orientation, and location. All systems should be coordinated during the space-planning stage to safely and effectively operate and maintain the central cooling and heating plant.
In addition, the mechanical engineer sometimes must represent other engineering disciplines in central plant space planning. If so, it is important for the engineer to understand the basics of electrical and plumbing required for central plant equipment. The main electrical transformer and switchgear rooms should be located as close to the incoming electrical service as practical. The main electric transformers and switchgear for the plant and the mechanical equipment switchgear panels should be in separate rooms that only authorized electricians can enter. If there is an emergency generator, it should be located considering (1) proximity to emergency electrical loads, (2) sources of combustion and cooling air, (3) fuel sources, (4) ease of properly venting exhaust gases outside, and (5) provisions for sound control.
The main plumbing equipment usually contains gas and domestic water meters, the domestic hot-water system, the fire protection system, and elements such as compressed air, special gases, and vacuum, sewage ejector, and sump pumps. Some water and gas utilities require a remote outdoor meter location.
The heating and air-conditioning equipment room houses the (1) boiler, pressure-reducing station, or both; (2) refrigeration machines, including chilled-water and condensing-water pumps; (3) converters for furnishing hot or cold water for heating and/or air conditioning; (4) control air compressors, if any; (5) vacuum and condensate pumps; and (6) miscellaneous equipment. For both chillers and boilers, especially in a centralized application, full access is needed on all sides (including overhead) for extended operation, maintenance, annual inspections of tubes, and tube replacement and repair. Where appropriate, the designer should include overhead structural elements to allow safe rigging of equipment. Ideally, large central facilities should include overhead cranes or gantries. It is critical to consult local codes and ASHRAE Standard 15 for special equipment room requirements. Many jurisdictions require monitoring, alarms, evacuation procedures, separating refrigeration and fuel-fired equipment, and high rates of purge ventilation.
A proper operating environment for equipment and those maintaining it must also be provided. This may involve heating the space for freeze protection and/or cooling the space to prevent overheating motors and controls. HVAC equipment serving the central plant itself may be housed in its own equipment room and serve the chiller, boiler room, and adjacent rooms (e.g., switchgear room, office space, generator room, pump room, machine shop). Where refrigeration equipment is installed, follow design requirements in ASHRAE Standard 15.
Location of Central Plant and Equipment
Although large central plants are most often located at or below grade, it is often economical to locate the refrigeration plant at the top of the building, on the roof, or on intermediate floors. In flood-prone areas, an above-grade installation can provide necessary protection against submersion of critical equipment. For central plants, on-grade should be the first choice, followed by below grade. The designer must always ensure access for maintenance and component or total replacement. Locating major equipment in roof penthouses may pose significant access problems for repair and replacement. For single high-rise central plants, intermediate-floor locations that are closer to the load may allow pumping equipment to operate at a lower pressure. A life-cycle cost analysis (LCCA) should include differences in plant location to identify the most attractive plant sustainability options during the planning stage. The LCCA should consider equipment maintenance access, repair, and replacement during the life of the plant, as determined in the owner’s criteria. If not identified, an engineer should suggest to the owner or client that maintenance criteria be included as a component in developing the LCCA (see the section on Maintenance Management Systems). Electrical service and structural costs are greater when intermediate-floor instead of ground-level locations are used, but may be offset by reduced energy consumption and condenser and chilled-water piping costs. The boiler plant may also be placed on the roof, eliminating the need for a chimney through the building.
Benefits of locating the air-cooled or evaporative condenser and/or cooling tower on the ground versus the roof should be evaluated. Personnel safety, security, ambient sound, and contamination from hazardous water vapors are some of the considerations that help determine final equipment location. Also, structural requirements (e.g., steel to support roof-mounted equipment, or a concrete pad and structural steel needed to locate equipment at or near grade) require evaluation. When locating a cooling tower at or near grade, the net positive suction head on the pump suction and overflow of condenser water out of the cooling tower sump should be studied if the tower is below, at, or slightly above the level of the condenser water pump or chiller.
Numerous variables should be considered when determining the optimum location of a central cooling or heating plant. When locating the plant, consider the following:
Operating weight of the equipment and its effect on structural costs
Vibration from primary and ancillary equipment and its effect on adjacent spaces in any direction
Sound levels from primary and ancillary equipment and their effect on adjacent spaces in any direction
Location of electrical utilities for the central plant room, including primary electric service and associated switchgear and motor control center, as well as electrical transformer location and its entrance into the building
Location of city water and fire pump room (it may be desirable to consolidate these systems near the central plant room)
Accessibility into the area and clearances around equipment for employee access, equipment and material delivery, and major equipment replacement, repair, scheduled teardown, and rigging
Location of cooling, refrigerant relief piping, heating, vents, and boiler flue and stack distribution out of the central plant and into the building, along with the flow path of possible vented hazardous chemical, steam, or combustion exhaust products
Need for shafts to provide vertical distribution of cooling and heating services in the building
Future expansion plans of the central plant (e.g., oversizing the central plant now for adding more primary equipment later, based on master planning of the facility)
Architectural effect on the site
Location of boiler chimney/flue
Loading dock for materials and supplies
Roadway and parking considerations
Storage of fuel
Electrical transformer location
Underground and/or overhead utility and central cooling and heating system distribution around the central plant and to the building(s)
Wind effect on cooling tower plume or other volatile discharges such as boiler emissions.
Security around a central plant must be considered in design, and should include standby electrical power generation and production of central cooling and heating for critical applications in times of outages or crisis.
Restricted access and proper location of exposed intakes and vents must be designed into the central plant layout to protect the facility from attack and protect people from injury. Use care in locating exposed equipment, vents, and intakes, especially at ground level. Above ground and at least 10 to 15 ft from access to intake face is preferred for the location of intakes. When this is not possible, fencing around exposed equipment, such as cooling towers and central plant intakes, should be kept locked at all times to prevent unauthorized access. Ensure that fencing is open to airflow so it does not adversely affect equipment performance. Air intakes should be located above street level if possible, and vents should be directed so they cannot discharge directly on passing pedestrians or into an air intake of the same or an adjacent facility.
7. AUTOMATIC CONTROLS AND BUILDING MANAGEMENT SYSTEMS
One advantage of central cooling and heating plants is easier implementation of building automation because the major and ancillary equipment is consolidated in one location. Computerized automatic controls can significantly affect system performance. A facility management system to monitor system points and overall system performance should be considered for any large, complex air-conditioning system. This allows a single operator to monitor performance at many points in a building and make adjustments to increase occupant comfort and to free maintenance staff for other duties. Chapter 48 of the 2019 ASHRAE Handbook—HVAC Applications describes design and application of controls.
Software to consider when designing, managing, and improving central plant performance should include the following:
Automatic controls that can interface with other control software (e.g., equipment manufacturers’ unit-mounted controls)
Energy management system (EMS) control
Hydraulic modeling, as well as metering and monitoring of distribution systems
Using VFDs on equipment (e.g., chillers, pumps, cooling tower fans) to improve system control and to control energy to consume only the energy required to meet the design parameters (e.g., temperature, flow, pressure).
Computer-aided facility management (CAFM) for integrating other software (e.g., record drawings, operation and maintenance manuals, asset database)
Computerized maintenance management software (CMMS)
Automation from other trades (e.g., fire alarm, life safety, medical gases, etc.)
Regulatory functions (e.g., refrigerant management, federal, state and local agencies, etc.)
Use of three-dimensional/building information modeling (BIM) in plant design that can be incorporated into the operational and maintenance scheme when the plant is completed and placed in operation
Automatic controls for central cooling and/or heating plants may include standard equipment manufacturer’s control logic along with optional, enhanced energy-efficiency control logic. These specialized control systems can be based on different architectures such as distributed controls, programmable logic controllers, or microprocessor-based systems. Beyond standard control technology, the following control points and strategies may be needed for primary equipment, ancillary equipment, and the overall system:
Discharge temperatures and/or pressures to verify component operation
Return and supply temperatures to monitor and control ΔT
Head pressure for refrigerant and/or water to ensure compressors and pumps are operating correctly
Stack temperature to ensure boilers are operating properly
Carbon monoxide and/or carbon dioxide levels (can indicate over- or underventilation)
Differential pressures (indicate whether flow or pressure drops are changing)
Flow rates of supply and return water and air, ventilation, etc. (all indicate energy use)
Peak and hourly refrigeration output
Peak and hourly heat energy output
Peak and hourly steam output
Flow rate of fuel(s) and electric demand by type of use
Temperature and/or pressure set points and status
Night setback status and set points
Economizer cycle status and set points
Variable flow through equipment and/or system control
Variable-frequency drive speeds, set points, and override status
Thermal storage control set points, charge mode, and percent capacity
Heat recovery cycle temperatures and performance
Occupancy status and override settings
Local weather conditions, including dry-bulb temperature, dew point, and forecast
History of these data points and building performance
See Chapter 43 of the 2019 ASHRAE Handbook—HVAC Applications for more information on control strategies and optimization.
The coefficient of performance (COP) for the entire chilled-water plant can be monitored and allows the plant operator to determine the overall operating efficiency of a plant. Central plant COP can be expressed in the following terms:
Annual heating or refrigeration per unit of building area (Btu per hour per square foot per year)
Energy used per unit of refrigeration (kilowatt-hours per ton)
Annual power required per unit of refrigeration per unit of building area (kilowatts per ton per square foot per year)
It is very important to measure and track performance of HVAC equipment to ensure that it is performing as intended and not drifting over time. Making it easier for personnel to review and trend the data is a key step in continuous commissioning. Dashboards and trending graphs can provide immediate visual representations of energy use and efficiency to highlight problems and items that need to be addressed.
Whole-building and occupancy measurements are useful for scheduling and usage issues (some of the most common and wasteful problems). Additional breakdowns of energy use by type and zone (chiller, boiler, fans, lights, etc.) allows better tracking and conservation over time. Some codes require separate power meters and trending by type of use.
All instrument operations where cooling or heating output are measured should have instrumentation calibration that is traceable to the National Institute of Standards and Technology (NIST).
The importance of local gages and indicating devices, with or without a facility management system, should not be overlooked. All equipment must have adequate pressure gages, thermometers, flow meters, balancing devices, and dampers for effective performance, monitoring, and commissioning (see also ASHRAE Guideline 22). In addition, capped thermometer wells, gage cocks, capped duct openings, and volume dampers should be installed at strategic points for system balancing. Chapter 39 of the 2019 ASHRAE Handbook—HVAC Applications indicates the locations and types of fittings required. Chapter 37 of the 2017 ASHRAE Handbook—Fundamentals has more information on measurement and instruments.
8. MAINTENANCE MANAGEMENT SYSTEMS
A review with the end user (owner) should be done, to understand the owner’s requirements for operation (e.g., if an owner has an in-house staff, more frequent access may be required, which may affect the extent to which a designer incorporates access). Reviewing ASHRAE Guideline 4 and Standard 15 with the owner can provide insight to the development of a maintenance plan. If maintenance is outsourced, extensive access may not be as high a priority. In some cases, regulatory and code access may be the only determining factors.
Operations and maintenance considerations include the following:
Accessibility around equipment, as well as above and below when applicable, with at least minimum clearances provided per manufacturers’ recommendations and applicable codes (typical space required for regular service is often larger than the minimums, which eases the burden on maintenance staff)
Clearances for equipment removal
Minimizing tripping hazards (e.g., drain piping extending along the floor)
Adequate headroom to avoid injuries
Trenching in floor, if necessary
Cable trays, if applicable
Adequate lighting levels
Task lighting, when needed
Eyewash stations for safety
Exterior access for outdoor air supply and for exhaust
Storage of mechanical and electrical parts and materials
Documentation storage and administrative support rooms
Proper drainage for system maintenance
Outlets for service maintenance utilities (e.g., water, electricity) in locations reasonably accessible to equipment operators
Adequate lines of sight to view thermometers, pressure gages, etc.
Structural steel elements for major maintenance rigging of equipment
Typical operator maintenance functions include cleaning of condensers, evaporators, and boiler tubes. Cooling tower catwalk safety railing and ladders should be provided to comply with U.S. Occupational Safety and Health Administration (OSHA) requirements.
9. BUILDING SYSTEM COMMISSIONING
Because a central plant consumes a major portion of the annual energy operating budget, building system commissioning is imperative for new construction and expansion of existing installations. During the warranty phase, central-plant performance should be measured, benchmarked, and course-corrected to ensure design intent is achieved. If an energy analysis study is performed as part of the comparison between decentralized and centralized concepts, the resulting month-to-month energy data should be a good electronic document to benchmark actual energy consumption using the measurement and verification plan implementation.
Ongoing commissioning or periodic recommissioning further ensures that the design intent is met, and that cooling and heating are reliably delivered after the warranty period. Many central systems are designed and built with the intent to connect to facilities in a phased program, which also requires commissioning. Consider retro- or recommissioning whenever the plant is expanded or an additional connection made to the existing systems, to ensure the original design intent is met.
It is very important to remember that all the heating and cooling is used outside of the mechanical room. Chiller and boiler commissioning will be severely limited if the engineer does not look at the coils, fans, valves, and other components that may be in other locations. Dirty coils and bypass valves can waste more energy than chiller and boiler maintenance can save.
Initial testing, adjusting, and balancing (TAB) also contributes to sustainable operation and maintenance. The TAB process should be repeated periodically to ensure original design levels are maintained.
When completing TAB and commissioning, consider posting laminated system flow diagrams at or adjacent to the central cooling and heating equipment, and include operating instructions, TAB performance, commissioning functional performance test results, and emergency shutoff procedures. These documents also should be filed electronically in the central plant computer server for quick reference.
Original basis of design and design criteria should be posted as a constant reminder of design intent, and to be readily available in case troubleshooting, expansion, or modernization is needed.
As with all HVAC applications, for maintainable, long-term operational success, building commissioning should include the system training requirements necessary for building management staff to efficiently take ownership and operate and maintain the HVAC systems over the useful service life of the installation.
10. SYSTEM REPLACEMENTS AND EXPANSIONS
More equipment is sold as replacements than for new construction. During replacements, the designer/specifier has more information available than during design (e.g., from observation and possibly operational trend logs). Typically, the difficulty is in finding the building’s original design details. It is usually necessary to survey the building to determine what is installed and whether it is the same as what is represented in the original design.
The engineer also must determine if the project will be merely a replacement of existing equipment, a system expansion, or even a reduction of equipment capacity (if the original equipment was oversized). A like-for-like replacement has the advantage of simplicity, and may also not require an update of the mechanical system to current code requirements.
For a straightforward replacement, the engineer still must verify that the replacement equipment will work within the capacity, electrical, and dimensional limitations, and that it is compatible with existing the control system and other equipment.
Replacements often offer the chance to correct shortcomings of the original design, as well, such as
Resizing when original equipment was over- or undersized (e.g., where equipment cannot handle facility loads, or where cooling systems cannot properly dehumidify the space)
Adjusting to better fit building loads that have changed (e.g., outdated lighting has been replaced with higher-efficiency LEDs) or that were inappropriately calculated (e.g., the building needs more [or less] cooling capacity)
Improving water and airflow rates
Other equipment (e.g., coils, towers, fans) that affect the system performance may also need replacement.
A common issue with central plants is that loads on the plant operate on different schedules. These nonsimultaneous, varied loads can introduce a low load demand on the system.
If the intent is to expand or reduce the capacity of the plant, the engineer must verify the existing equipment’s operational capabilities before deciding what equipment to replace.