Other relevant ASHRAE resources include the following.
General Design Considerations
Despite cyclical market fluctuations, office buildings are considered the most complex and
competitive segments of real estate development. Survey data of 824 000 office
buildings (EIA 2003) demonstrate the distribution of the U.S. office buildings by the numbers
and the area, as shown in Table 1.
According to Gause (1998), an office building can be divided into the following categories:
Class. The most basic feature, class represents the
building’s quality by taking into account variables such as age, location, building
materials, building systems, amenities, lease rates, etc. Office buildings are of three classes:
A, B, and C. Class A is generally the most desirable
building, located in the most desirable locations, and offering first-rate design, building
systems, and amenities. Class B buildings are located
in good locations, have little chance of functional obsolescence, and have reasonable
management. Class C buildings are typically older,
have not been modernized, are often functionally obsolete, and may contain asbestos. These low
standards make Class C buildings potential candidates for demolition or conversion to another
use.
Size and Flexibility. Office buildings are typically
grouped into three categories: high rise (16 stories
and above), mid rise (four to 15 stories), and low rise (one to three stories).
Location. An office building is typically in one of
three locations: downtown (usually high rises), suburban (low- to mid-rise buildings), or business/industrial park (typically one- to three-story
buildings).
Floorplate (Floor Space Area). Size typically ranges
from 1670 to 2800 m2 and averages from 1860 to 2320
m2.
Use and Ownership. Office buildings can be single
tenant or multitenant. A single-tenant building can be owned by the tenant or leased from a
landlord. From an HVAC&R systems standpoint, a single tenant/owner is more cautious
considering issues such as life-cycle cost and energy conservation. In many cases, the systems
are not selected based on the lowest first cost but on life-cycle cost. Sometimes, the developer
may wish to select a system that allows individual tenants to pay directly for the energy they
consume.
Building Features and Amenities. Examples typically
include parking, telecommunications, HVAC&R, energy management, restaurants, security,
retail outlets, and health club.
Typical areas that can be found in office buildings are
Employee/Visitor Support Spaces
-
Convenience store, kiosk, or vending machines
-
Lobby: central location for building directory, schedules, and general information
-
Atria or common space: informal, multipurpose recreation and social gathering space
-
Cafeteria or dining hall
-
Private toilets or restrooms
-
Child care centers
-
Physical fitness area
-
Interior or surface parking areas
Administrative Support Spaces
Operation and Maintenance Spaces
-
General storage: for items such as stationery, equipment, and instructional
materials
-
Food preparation area or kitchen
-
Computer/information technology (IT) closets
-
Maintenance closets
-
Mechanical and electrical rooms
A well-designed and functioning HVAC system should provide the following:
-
Comfortable and consistent temperature and humidity
-
Adequate amounts of outdoor air at all time to satisfy ventilation requirements
-
Remove odors and contaminates from circulated air
The major factors affecting sizing and selection of the HVAC systems are as follows:
-
Building size, shape and number of floors
-
Amount of exterior glass
-
Orientation, envelope
-
Internal loads, occupants, lighting
-
Thermal zoning (number of zones, private offices, open areas, etc.)
Office HVAC systems generally range from small, unitary, decentralized cooling and heating up to
large systems comprising central plants (chillers, cooling towers, boilers, etc.) and large
air-handling systems. Often, several types of HVAC systems are applied in one building because
of special requirements such as continuous operation, supplementary cooling, etc. In office
buildings, the class of the building also affects selection of the HVAC systems. For example, in
a class A office building, the HVAC&R systems must meet more stringent criteria, including
individual thermal control, noise, and flexibility; HVAC systems such as single-zone
constant-volume, water-source heat pump, and packaged terminal air conditioners (PTACs) might be
inapplicable to this class, whereas properly designed variable-air-volume (VAV) systems can meet
these requirements.
A typical HVAC design criteria covers parameters required for thermal comfort, indoor air quality
(IAQ), and sound. Thermal comfort parameters (temperature and humidity) are discussed in ASHRAE
Standard 55 and Chapter 9 of the 2021 ASHRAE
Handbook—Fundamentals. Ventilation and IAQ are covered by ASHRAE Standard 62.1, the user’s manual for that standard (ASHRAE
2021), and Chapter 16 of the 2021 ASHRAE
Handbook—Fundamentals. Sound and vibration are discussed in Chapter 49 of this volume
and
Chapter 8 of the 2021 ASHRAE
Handbook—Fundamentals.
Thermal comfort is affected by air temperature, humidity, air velocity, and mean radiant
temperature (MRT), as well as nonenvironmental factors such as clothing, gender, age, and
physical activity. These variables and how they correlate to thermal comfort can be evaluated by
the Thermal Comfort Tool CD (ASHRAE 2011) in conjunction with ASHRAE
Standard 55. General guidelines for temperature and humidity
applicable for areas in office buildings are shown in Table
2.
All office, administration, and support areas need outdoor air for ventilation. Outdoor air is
introduced to occupied areas and then exhausted by fans or exhaust openings, removing indoor air
pollutants generated by occupants and any other building-related sources. ASHRAE Standard 62.1 is used as the basis for many building codes. To define
the ventilation and exhaust design criteria, consult local applicable ventilation and exhaust
standards. Table
3 provides recommendations for ventilation design based on the ventilation rate
procedure method and filtration criteria for office buildings.
Acceptable noise levels in office buildings are important for office personnel; see Table
4 and Chapter 49.
Office buildings usually include both peripheral and interior zone spaces. The peripheral zone
extends 3 to 3.6 m inward from the outer wall toward the interior of the building,
and frequently has a large window area. These zones may be extensively subdivided. Peripheral
zones have variable loads because of changing sun position and weather. These zones typically
require heating in winter. During intermediate seasons, one side of the building may require
cooling, while another side requires heating. However, the interior zone spaces usually require
a fairly uniform cooling rate throughout the year because their thermal loads are derived almost
entirely from lights, office equipment, and people. Interior space conditioning is often by
systems that have VAV control for low- or no-load conditions.
Most office buildings are occupied from approximately 8:00 am to 6:00 pm; many are occupied by
some personnel from as early as 5:30 am to as late as 7:00 pm. Some tenants’ operations
may require night work schedules, usually not beyond 10:00 pm. Office buildings may contain
printing facilities, information and computing centers, or broadcasting studios, which could
operate 24 h per day. Therefore, for economical air-conditioning design, the intended uses of an
office building must be well established before design development.
Occupancy varies considerably. In accounting or other sections where clerical work is done, the
maximum density is approximately one person per 7 m2 of floor area.
Where there are private offices, the density may be as little as one person per 19
m2. The most serious cases, however, are the occasional waiting rooms,
conference rooms, or directors’ rooms, where occupancy may be as high as one person per
2 m2.
The lighting load in an office building can be a significant part of the total heat load.
Lighting and normal equipment electrical loads average from 10 to 50
W/m2 but may be considerably higher, depending on the type of lighting and
amount of equipment. Buildings with computer systems and other electronic equipment can have
electrical loads as high as 50 to 110 W/m2. The amount, size, and type
of computer equipment anticipated for the life of the building should be accurately appraised to
size the air-handling equipment properly and provide for future installation of air-conditioning
apparatus.
Total lighting heat output from recessed fixtures can be withdrawn by exhaust or return air and
thus kept out of space-conditioning supply air requirements. By connecting a duct to each
fixture, the most balanced air system can be provided. However, this method is expensive, so the
suspended ceiling is often used as a return air plenum with air drawn from the space to above
the suspended ceiling.
Miscellaneous allowances (for fan heat, duct heat pickup, duct leakage, and safety factors)
should not exceed 12% of the total load.
Building shape and orientation are often determined by the building site, but some variations in
these factors can increase refrigeration load. Shape and orientation should therefore be
carefully analyzed in the early design stages.
The variety of functions and range of design
criteria applicable to office buildings have allowed the use of almost every available
air-conditioning system. Multistory structures are discussed here, but the principles and
criteria are similar for all sizes and shapes of office buildings.
Attention to detail is extremely important, especially in modular buildings. Each piece of
equipment, duct and pipe connections, and the like may be duplicated hundreds of times. Thus,
seemingly minor design variations may substantially affect construction and operating costs. In
initial design, each component must be analyzed not only as an entity, but also as part of an
integrated system. This systems design approach is essential for achieving optimum results.
As discussed under General Design Considerations, there are several classes of office buildings,
determined by the type of financing required and the tenants who will occupy the building.
Design evaluation may vary considerably based on specific tenant requirements; it is not enough
to consider typical floor patterns only. Many larger office buildings include stores,
restaurants, recreational facilities, data centers, telecommunication centers, radio and
television studios, and observation decks.
Built-in system flexibility is essential for office building design. Business office procedures
are constantly being revised, and basic building services should be able to meet changing tenant
needs.
The type of occupancy may have an important bearing on air distribution system selection. For
buildings with one owner or lessee, operations may be defined clearly enough that a system can
be designed without the degree of flexibility needed for a less well-defined operation. However,
owner-occupied buildings may require considerable design flexibility because the owner will pay
for all alterations. The speculative builder can generally charge alterations to tenants. When
different tenants occupy different floors, or even parts of the same floor, the degree of design
and operation complexity increases to ensure proper environmental comfort conditions to any
tenant, group of tenants, or all tenants at once. This problem is more acute if tenants have
seasonal and variable overtime schedules.
Certain areas may have hours of occupancy or design criteria that differ substantially from those
of the office administration areas; such areas should have their own air distribution systems
and, in some cases, their own heating and/or refrigeration equipment.
Main entrances and lobbies are sometimes served by a separate and self contained system because
they buffer the outdoor atmosphere and the building interior. Some engineers prefer to have a
lobby summer temperature 2 to 3.5 K above office temperature to reduce operating
cost and temperature shock to people entering or leaving the building. In cases where lobbies or
main entrances have longer (or constant) operation, a dedicated/self-contained HVAC system is
recommended to allow turning off other building systems.
The unique temperature and humidity requirements of server rooms or computer equipment/data
processing installations, and the fact that they often run 24 h per day for extended periods,
generally warrant separate refrigeration and air distribution systems. Separate back-up systems
may be required for data processing areas in case the main building HVAC system fails. Chapter
20 has further information.
The degree of air filtration required should be determined. Service cost and effect of air
resistance on energy costs should be analyzed for various types of filters. Initial filter cost
and air pollution characteristics also need to be considered. Activated charcoal filters for
odor control and reduction of outdoor air requirements are another option to consider.
Providing office buildings with continuous 100% outdoor air (OA) is seldom justified, so most
office buildings are designed to minimize outdoor air use, except during economizer operation.
However, attention to indoor air quality may dictate higher levels of ventilation air. In
addition, the minimum volume of outdoor air should be maintained in variable-volume air-handling
systems. Dry-bulb- or enthalpy-controlled economizer cycles should be considered for reducing
energy costs. Consult ASHRAE Standard 90.1 for the proper air
economizer system (dry-bulb or enthalpy). When an economizer cycle is used, systems should be
zoned so that energy is not wasted by heating outdoor air. This is often accomplished by a
separate air distribution system for the interior and each major exterior zone. A dedicated
outdoor air system (DOAS) can be considered where the zones are served by in-room terminal
systems (fan coils, induction unit systems, etc.) or decentralized systems [e.g., minisplit
HVAC, water-source heat pump (WSHP)]. Because the outdoor air supply is relatively low in office
buildings, air-to-air heat recovery is not cost effective; instead, a DOAS with enhanced cooling
and dehumidification systems can be used.
These systems typically use hot-gas reheat or other means of free reheat (e.g., heat pipes,
plate-frame heat exchangers). In hot, humid climates, these systems can significantly improve
space conditions. By having a DOAS, the OA supply can be turned off during unoccupied hours
(which can be significant in office buildings). In unoccupied mode, the in-room unit needs to
maintain only the desired space conditions (e.g., night/weekend setback temperature).
High-rise office buildings have traditionally used perimeter fan-powered VAV terminals,
induction, or fan-coil systems. Separate all-air systems have generally been used for the
interior and/or the exterior for the fan-powered VAV perimeter terminals; modulated air
diffusers and fan-powered perimeter unit systems have also been used. If variable-air-volume
systems serve the interior, perimeters are usually served by variable-volume fan-powered
terminals, typically equipped with hydronic (hot-water) or electric reheat coils. In colder
climates, perimeter baseboard heaters are commonly applied. Baseboards are typically installed
under windows to minimize the effect of the cold surface.
Many office buildings without an economizer cycle have a bypass multizone unit installed on each
floor or several floors with a heating coil in each exterior zone duct. VAV variations of the
bypass multizone and other floor-by-floor, all-air, or self-contained systems are also used.
These systems are popular because of their low fan power and initial cost, and the energy
savings possible from independent operating schedules between floors occupied by tenants with
different operating hours.
Perimeter radiation or infrared systems with conventional, single-duct, low-velocity air
conditioning that furnishes air from packaged air-conditioning units may be more economical for
small office buildings. The need for a perimeter system, which is a function of exterior glass
percentage, external wall thermal value, and climate severity, should be carefully analyzed.
A perimeter heating system separate from the cooling system is preferable, because air
distribution devices can then be selected for a specific duty rather than as a compromise
between heating and cooling performance. The higher cost of additional air-handling or fan-coil
units and ductwork may lead the designer to a less expensive option, such as fan-powered
terminal units with heating coils serving perimeter zones in lieu of a separate heating system.
Radiant ceiling panels for perimeter zones are another option.
Interior space use usually requires that interior air-conditioning systems allow modification to
handle all load situations. Variable-air-volume systems are often used. When using these
systems, low-load conditions should be carefully evaluated to determine whether adequate air
movement and outdoor air can be provided at the proposed supply air temperature without
overcooling. Increases in supply air temperature tend to nullify energy savings in fan power,
which are characteristic of VAV systems. Low-temperature air distribution for additional savings
in transport energy is seeing increased use, especially when coupled with an ice storage system.
In small to medium-sized office buildings, air-source heat pumps or minisplit systems (cooling
only, heat pump, or combination) such as variable refrigerant flow (VRF) may be chosen. VRF
systems that can cool and heat simultaneously are available and allow users to provide heating
in perimeter zones and cooling in interior zones in a similar fashion to four-pipe fan coil
(FPFC) systems. In larger buildings, water-source heat pump (WSHP) systems are feasible with
most types of air-conditioning systems. Heat removed from core areas is rejected to either a
cooling tower or perimeter circuits. The water-source heat pump can be supplemented by a central
heating system or electrical coils on extremely cold days or over extended periods of limited
occupancy. Removed excess heat may also be stored in hot-water tanks. Note that in-room systems
(e.g., VRF, WSHP) might need a DOAS to provide the required outdoor air.
Many heat recovery or water-source heat pump systems exhaust air from conditioned spaces through
lighting fixtures. This reduces required air quantities and extends lamp life by providing a
much cooler ambient operating environment.
Suspended-ceiling return air plenums eliminate sheet metal return air ductwork to reduce
floor-to-floor height requirements. However, suspended-ceiling plenums may increase the
difficulty of proper air balancing throughout the building. Problems often connected with
suspended ceiling return plenums include
-
Air leakage through cracks, with resulting smudges
-
Tendency of return air openings nearest to a shaft opening or collector duct to pull
too much air, thus creating uneven air motion and possible noise
-
Noise transmission between office spaces
Air leakage can be minimized by proper workmanship. To overcome drawing too much air, return air
ducts can be run in the suspended ceiling pathway from the shaft, often in a simple radial
pattern. Ends of ducts can be left open or dampered. Generous sizing of return air grilles and
passages lowers the percentage of circuit resistance attributable to the return air path. This
bolsters effectiveness of supply-air-balancing devices and reduces the significance of air
leakage and drawing too much air. Structural blockage can be solved by locating openings in
beams or partitions with fire dampers, where required.
Systems and Equipment Selection
Selection of HVAC equipment and systems depends on whether the facility is new or existing, and
whether it is to be totally or partially renovated. For minor renovations, existing HVAC systems
are often expanded in compliance with current codes and standards with equipment that matches
the existing types. For major renovations or new construction, new HVAC systems and equipment
should be installed. When applicable, the remaining useful life of existing equipment and
distribution systems should be considered.
HVAC systems and equipment energy use and associated life cycle costs should be evaluated. Energy
analysis may justify new HVAC equipment and systems when an acceptable return on investment can
be shown. The engineer must review all assumptions in the energy analysis with the owner. Other
considerations for existing facilities are (1) whether the central plant is of adequate capacity
to handle additional loads from new or renovated facilities; (2) age and condition of existing
equipment, pipes, and controls; and (3) capital and operating costs of new equipment.
Chapter 1 of the 2020 ASHRAE
Handbook—HVAC Systems and
Equipment provides general guidelines on HVAC systems analysis and selection
procedures. Although in many cases system selection is based solely on the lowest first cost, it
is suggested that the engineer propose a system with the lowest life-cycle cost (LCC). LCC
analysis typically requires hour-by-hour building energy simulation for annual energy cost
estimation. Detailed first and maintenance cost estimates of proposed design alternatives, using
sources such as R.S. Means (R.S. Means 2022a, 2022), can also be used for the LCC analysis along
with software such as BLCC 5.3.22 (FEMP 2022). Refer to Chapters 38 and 60 and the
Value Engineering and Life-Cycle Cost Analysis section of this chapter for additional
information.
System Types. HVAC systems for office buildings may be
centralized, decentralized, or a combination of both. Centralized systems typically incorporate
secondary systems to treat the air and distribute it. The cooling and heating medium is
typically water or brine that is cooled and/or heated in a primary system and distributed to the
secondary systems. Centralized systems comprise the following systems:
More detailed information on systems selection by application can be found in Table 5.
Typical decentralized systems (dedicated systems serving a single zone, or packaged systems such
as packaged variable air volume) include the following:
-
Water-source heat pumps (WSHP), also known as water-loop heat pumps (WLHP)
-
Geothermal heat pumps (e.g., groundwater heat pumps, ground-coupled heat pumps)
-
Hybrid geothermal heat pumps (combination of groundwater heat pumps, ground-coupled
heat pumps, and an additional heat rejection device) for cases with limited area for
the ground-coupled heat exchanger or where it is economically justified
-
Packaged single-zone and variable-volume units
-
Light commercial split systems
-
Minisplit and variable refrigerant flow (VRF) units
Chapters 2, 9, 48, and 49 of the 2020 ASHRAE
Handbook—HVAC Systems and
Equipment provide additional information on decentralized HVAC systems.
Additional
information on geothermal energy can be found in Chapter 35
of this volume.
Whereas small office buildings (<2320 m2) normally apply packaged
unitary and split systems equipment, larger office buildings can use a combination of packaged,
unitary, split, and/or centralized systems, or large packaged rooftop systems. The building
class also must be considered during system selection.
Systems Selection by Application. Table 5
shows the applicability of several systems for office buildings.
The following is a list of systems that can be considered for special areas in office buildings.
Chapter 58 of this volume, Chapter 6
of the 2020 ASHRAE Handbook—HVAC Systems and
Equipment, and
Skistad et al. (2002) provide additional information of these systems.
Demand-Controlled Ventilation (DCV). Demand-controlled
ventilation can reduce the operating cost of HVAC systems. Areas such as auditoriums, large
conference rooms, and other spaces designed for large numbers of occupants and intermittent
occupancy can use DCV. This approach is most cost effective when one dedicated air handling
system serves each of these zones. Special attention is required when DCV is applied to VAV
systems. In these cases, it is insufficient to use only one CO2 sensor in the return
air plenum of the central AHU, because the readings are the average of all the zones. To address
properly DCV in a VAV system, a CO2 sensor is required in every controlled zone.
Total office building electromechanical space requirements vary tremendously based on types of
systems planned; however, the average is approximately 8 to 10% of the gross area. Clear height
required for fan rooms varies from approximately 3 to 5.5 m, depending on the
distribution system and equipment complexity. On office floors, perimeter fan-coil or induction
units require approximately 1 to 3% of the floor area. Interior air shafts and pipe chases
require approximately 3 to 5% of the floor area. Therefore, ducts, pipes, and equipment require
approximately 4 to 8% of each floor’s gross area.
Where large central units supply multiple floors, shaft space requirements depend on the number
of fan rooms. In such cases, one mechanical equipment room usually furnishes air requirements
for 8 to 20 floors (above and below for intermediate levels), with an average of 12 floors. The
more floors served, the larger the duct shafts and equipment required. This results in higher
fan room heights and greater equipment size and mass.
The fewer floors served by an equipment room, the greater the flexibility in serving changing
floor or tenant requirements. Often, one mechanical equipment room per floor and complete
elimination of vertical shafts requires no more total floor area than fewer larger mechanical
equipment rooms, especially when there are many small rooms and they are the same height as
typical floors. Equipment can also be smaller, although maintenance costs are higher. Energy
costs may be reduced with more equipment rooms serving fewer areas, because equipment can be
shut off in unoccupied areas, and high-pressure ductwork is not required. Equipment rooms on
upper levels generally cost more to install because of rigging and transportation logistics.
In all cases, mechanical equipment rooms must be thermally and acoustically isolated from office
areas.
Cooling Towers. Cooling towers can be the largest
single piece of equipment required for air-conditioning systems. Cooling towers require
approximately 1 m2 of floor area per 400 m2 of
total building area and are 4 to 12 m high. If towers are located on the roof, the
building structure must be able to support the cooling tower and dunnage, full water load
(approximately 590 to 730 kg/m2), and seismic and wind load stresses.
Where cooling tower noise may affect neighboring buildings, tower design should include sound
traps or other suitable noise baffles. This may affect tower space, mass of the units, and motor
power. Slightly oversizing cooling towers can reduce noise and power consumption because of
lower speeds and also the ability to reduce the condenser water temperature, which reduces
cooling energy. The size increase may increase initial cost.
Cooling towers are sometimes enclosed in a decorative screen for aesthetic reasons; therefore,
calculations should ascertain that the screen has sufficient free area for the tower to obtain
its required air quantity and to prevent recirculation.
If the tower is placed in a rooftop well or near a wall, or split into several towers at various
locations, design becomes more complicated, and initial and operating costs increase
substantially. Also, towers should not be split and placed on different levels because hydraulic
problems increase. Finally, the cooling tower should be built high enough above the roof so that
the bottom of the tower and the roof can be maintained properly.
Office building areas with special ventilation and cooling requirements include elevator machine
rooms, electrical and telephone closets, electrical switchgear, plumbing rooms, refrigeration
rooms, and mechanical equipment rooms. The high heat loads in some of these rooms may require
air-conditioning units for spot cooling.
In larger buildings with intermediate elevator, mechanical, and electrical machine rooms, it is
desirable to have these rooms on the same level or possibly on two levels. This may simplify
horizontal ductwork, piping, and conduit distribution systems and allow more effective
ventilation and maintenance of these equipment rooms.
An air-conditioning system cannot prevent occupants at the perimeter from feeling direct
sunlight. Venetian blinds and drapes are often provided but seldom used. External shading
devices (screens, overhangs, etc.) or reflective glass are preferable.
Tall buildings in cold climates experience severe stack effect. The extra amount of heat provided
by the air-conditioning system in attempts to overcome this problem can be substantial. The
following features help combat infiltration from stack effect:
-
Revolving doors or vestibules at exterior entrances
-
Pressurized lobbies or lower floors
-
Tight gaskets on stairwell doors leading to the roof
-
Automatic dampers on elevator shaft vents
-
Tight construction of the exterior skin
-
Tight closure and seals on all dampers opening to the exterior
2. TRANSPORTATION CENTERS
Major transportation facilities include transit
facilities (rail transit, bus terminals), airports, and cruise terminals. Other areas that can be
found in transportation centers are airplane hangars and freight and mail buildings, which can be
treated as warehouse facilities. Bus terminals are covered partially in this chapter, but Chapter 16 provides more detail.
Airports are large, complex, and highly profitable enterprise. Most U.S. airports
are public nonprofits, run directly by government entities or by government-created authorities
known as airport or port authorities. There are three main types of airports:
-
International airports serving over 20
million passengers a year.
-
National airports serving between 2 to 20
million passengers a year.
-
Regional airport serving up to 2 million
passengers a year.
Airports typically consists the following:
-
Runways and taxiing areas
-
Air traffic control buildings
-
Aircraft maintenance buildings and hangars
-
Passenger terminals and car parking (open, partially open, or totally enclosed)
-
Freight warehouses
-
Lodging facilities (hotels)
In addition, support areas such as administration buildings, central utility plants, and transit
facilities (rail and bus) are common in airport facilities.
Areas such as hangars, hotels, and car parking are not covered in this section. Information about
hotels and parking garages can be found in Chapters 7 and 16, respectively. Warehouses
are discussed in the next section of this chapter.
Most terminals can be divided into the following sections and subsections:
Departure
-
Entrance concourse
-
Check-in and ticketing
-
Security and passports
-
Shops, restaurants, banks, medical services, conference and business facilities, etc.
-
Departure lounge
-
Departure gates
Cruise terminals typically have three main areas: departure/arrival concourse, ticketing, and
baggage handling. These areas are open and large, and are designed to provide acceptable thermal
comfort to the passenger during embarkation and debarkation.
Transportation centers consist of a variety of areas, such as administration, large open areas,
shops, and restaurants. Design criteria for these areas should be based on information on
relevant chapters from this volume or ASHRAE Standard 62.1.
Airports, cruise terminals, and bus terminals operate on a 24 h basis, with a reduced schedule
during late night and early morning hours. To better understand the load characteristics of
these facilities, computer-based building energy modeling and simulation tools should be used;
this chapter provides basic information and references for energy modeling. Given the dynamic
nature of transportation facilities, well-supported assumptions of occupancy schedules should be
established during the analysis process.
Airports. Terminal buildings consist of large, open
circulating areas, one or more floors high, often with high ceilings, ticketing counters, and
various types of stores, concessions, and convenience facilities. Lighting and equipment loads
are generally average, but occupancy varies substantially. Exterior loads are, of course, a
function of architectural design. The largest single problem often is thermal drafts created by
large entranceways, high ceilings, and long passageways that have openings to the outdoors.
Cruise
Terminals. Freight and passenger docks consist of
large, high-ceilinged structures with separate areas for administration, visitors, passengers,
cargo storage, and work. The floor of the dock is usually exposed to the outdoors just above the
water level. Portions of the sidewalls are often open while ships are in port. In addition, the
large ceiling (roof) area presents a large heating and cooling load. Load characteristics of
passenger dock terminals generally require roof and floors to be well insulated. Occasional
heavy occupancy loads in visitor and passenger areas must be considered.
Bus Terminals. These buildings consist of two general areas: the terminal, which
contains passenger circulation, ticket booths, and stores or concessions; and the bus loading
area. Waiting rooms and passenger concourse areas are subject to a highly variable occupant
load: density may reach 1 m2 per person and, at extreme periods,
0.3 to 0.5 m2 per person. Chapter 16 has further
information on bus terminals.
Heating and cooling is generally centralized or provided for each building or group in a complex.
In large, open-circulation areas of transportation centers, any all-air system with zone control
can be used. Where ceilings are high, air distribution is often along the side wall to
concentrate air conditioning where desired and avoid disturbing stratified air. Perimeter areas
may require heating by radiation, a fan-coil system, or hot air blown up from the sill or floor
grilles, particularly in colder climates. Hydronic perimeter radiant ceiling panels may be
especially suited to these high-load areas.
Airports. Airports generally consist of one or more
central terminal buildings connected by long passageways or trains to rotundas containing
departure lounges for airplane loading. Most terminals have portable telescoping-type loading
bridges connecting departure lounges to the airplanes. These passageways eliminate heating and
cooling problems associated with traditional permanent passenger-loading structures.
Because of difficulties in controlling the air balance and because of the many outdoor openings,
high ceilings, and long, low passageways (which often are not air conditioned), the terminal
building (usually air conditioned) should be designed to maintain a substantial positive
pressure. Zoning is generally required in passenger waiting areas, in departure lounges, and at
ticket counters to take care of the widely variable occupancy loads.
Main entrances may have vestibules and windbreaker partitions to minimize undesirable air
currents in the building.
Hangars must be heated in cold weather, and ventilation may be required to eliminate possible
fumes (although fueling is seldom permitted in hangars). Gas-fired, electric, and low- and
high-intensity radiant heaters are used extensively in hangars because they provide comfort for
employees at relatively low operating costs.
Hangars may also be heated by large air blast heaters or floor-buried heated liquid coils. Local
exhaust air systems may be used to evacuate fumes and odors that occur in smaller ducted
systems. Under some conditions, exhaust systems may be portable and may include odor-absorbing
devices.
Cruise Terminals. In severe climates, occupied floor
areas may contain heated floor panels. The roof should be well insulated, and, in appropriate
climates, evaporative spray cooling substantially reduces the summer load. Freight docks are
usually heated and well ventilated but seldom cooled.
High ceilings and openings to the outdoors may present serious draft problems unless the systems
are designed properly. Vestibule entrances or air curtains help minimize cross drafts. Air door
blast heaters at cargo opening areas may be quite effective.
Ventilation of the dock terminal should prevent noxious fumes and odors from reaching occupied
areas. Therefore, occupied areas should be under positive pressure and cargo and storage areas
exhausted to maintain negative air pressure. Occupied areas should be enclosed to simplify any
local air conditioning.
In many respects, these are among the most difficult buildings to heat and cool because of their
large open areas. If each function is properly enclosed, any commonly used all-air or large
fan-coil system is suitable. If areas are left largely open, the best approach is to concentrate
on proper building design and heating and cooling of the openings. High-intensity infrared spot
heating is often advantageous (see Chapter
16 of the 2020 ASHRAE
Handbook—HVAC Systems and Equipment). Exhaust ventilation from tow
truck and
cargo areas should be exhausted through the roof of the dock terminal.
Bus Terminals. Conditions are similar to those for
airport terminals, except that all-air systems are more practical because ceiling heights are
often lower, and perimeters are usually flanked by stores or office areas. The same systems are
applicable as for airport terminals, but ceiling air distribution is generally feasible.
Properly designed radiant hydronic or electric ceiling systems may be used if high-occupancy
latent loads are fully considered. This may result in smaller duct sizes than are required for
all-air systems and may be advantageous where bus-loading areas are above the terminal and
require structural beams. This heating and cooling system reduces the volume of the building
that must be conditioned. In areas where latent load is a concern, heating-only panels may be
used at the perimeter, with a cooling-only interior system.
The terminal area air supply system should be under high positive pressure to ensure that no
fumes and odors infiltrate from bus areas. Positive exhaust from bus loading areas is essential
for a properly operating total system (see Chapter 16).
Systems and Equipment Selection
Given the size and magnitude of the systems in airports and cruise terminals, the selection of
the HVAC equipment and systems tend to be centralized. Depending on the area served and site
limitations, decentralized systems can also be considered for these specific cases.
Centralized systems typically incorporate secondary systems to treat and distribute air. The
cooling and heating medium is typically water or brine that is cooled and/or heated in a primary
system and distributed to the secondary systems. Centralized systems comprise the following
systems:
Primary Systems
-
Central cooling and heating plant (see Chapter 3 of the 2020 ASHRAE Handbook—HVAC Systems and Equipment)
-
For cases where decentralized systems (dedicated systems serving a single zone or
packaged systems such as packaged variable air volume) are
-
Water-source heat pumps (WSHP) (also known as water-loop heat pumps or WLHP)
-
Packaged single-zone and variable-volume units
-
Light commercial split systems
-
Mini-split and variable-refrigerant-flow (VRF) units
Airports. Filtering outdoor air with activated
charcoal filters should be considered for areas subject to excessive noxious fumes from jet
engine exhausts. However, locating outdoor air intakes as remotely as possible from airplanes is
a less expensive and more positive approach.
Where ionization filtration enhancers are used, outdoor air quantities are sometimes reduced
because the air is cleaner. However, care must be taken to maintain sufficient amounts of
outdoor air for space pressurization.
Cruise Terminals. Ventilation design must ensure that
fumes and odors from forklifts and cargo in work areas do not penetrate occupied and
administrative areas.
Bus Terminals. The primary concerns with enclosed bus
loading areas are health and safety problems, which must be handled by proper ventilation (see
Chapter 16). Although diesel
engine fumes are generally not as noxious as gasoline fumes, bus terminals often have many buses
loading and unloading at the same time, and the total amount of fumes and odors may be
disturbing.
In terms of health and safety, enclosed bus loading areas and automobile parking garages
present the most serious problems. Three major problems are encountered, the first and most
serious of which is emission of carbon monoxide (CO) by cars and oxides of nitrogen (NOx) by buses, which can cause serious illness and possibly
death. Oil and gasoline fumes, which may cause nausea and headaches and can create a fire
hazard, are also of concern. The third issue is lack of air movement and the resulting stale
atmosphere caused by increased CO content in the air. This condition may cause headaches or
grogginess. Most codes require a minimum ventilation rate to ensure that the CO concentration
does not exceed safe limits. Chapter 16 covers
ventilation requirements and calculation procedures for enclosed vehicular facilities in detail.
All underground garages should have facilities for testing the CO concentration or should have
the garage checked periodically. Problems such as clogged duct systems; improperly operating
fans, motors, or dampers; or clogged air intake or exhaust louvers may not allow proper air
circulation. Proper maintenance is required to minimize any operational defects.
3. WAREHOUSES AND DISTRIBUTION CENTERS
General Design Considerations
Warehouses can be defined as facilities that provide proper environment for the purpose
of storing goods and materials. They are also
used to store equipment and material inventory at industrial facilities. At times, warehouses
may be open to the public. The buildings are generally not air conditioned, but often have
sufficient heat and ventilation to provide a tolerable working environment. In many cases,
associated facilities occupied by office workers, such as shipping, receiving, and inventory
control offices, are air conditioned. Warehouses must be designed to accommodate the loads of
materials to be stored, associated handling equipment, receiving and shipping operations and
associated trucking, and needs of operating personnel. Types of warehouses include the
following:
-
Heated and unheated general warehouses
provide space for bulk, rack, and bin storage, aisle space, receiving and shipping
space, packing and crating space, and office and toilet space. As indicated some
areas are typically equipped with small-decentralized air-conditioning systems for
the support personnel.
-
Conditioned general warehouses are similar
to heated and unheated general warehouses, but can provide space cooling to meet the
stored goods’ requirements.
-
Refrigerated warehouses are designed to
preserve the quality of perishable goods and general supply materials that require
refrigeration. This includes freeze and chill spaces, processing facilities, and
mechanical areas. For information on this type of warehouse, see Chapters 23 and 24
in the 2022 ASHRAE Handbook—Refrigeration.
-
Controlled humidity (CH) and dry-air storage
warehouses are similar to general warehouses except that
they are constructed with vapor barriers and contain humidity control equipment to
maintain humidity at desired levels. For additional information, see Chapter 29 of
Harriman et al. (2001).
-
Specialty warehouses includes storing
facilities with special and in some instances strict requirements for temperature,
humidity, cleanliness, minimum ventilation rates, etc. These facilities are
typically conditioned to achieve the required space conditions. These warehouses can
be found in industrial and manufacturing facilities or can be standalone buildings.
Examples include
-
Pharmaceutical and life sciences facilities. Good manufacturing practices
(GMP) may be required.
-
Liquid storage (fuel and nonpropellants), flammable and combustible
storage, radioactive material storage, hazardous chemical storage, and
ammunition storage.
-
Automated storage and retrieval systems (AS/RS), which are designed for
maximum storage and minimum personnel on site. They are built for
lower-temperature operation with minimal heat and light needed, but
require a tall structure with extremely level floors. In some cases,
specialty HVAC equipment is required for servers and other computer
areas in AS/RS facility.
Features already now common in warehouse designs are higher bays, sophisticated
materials-handling equipment, broadband connectivity access, and more distribution networks. A
wide range of storage alternatives, picking alternatives, material-handling equipment, and
software exist to meet the physical and operational requirements. Warehouse spaces must also be
flexible to accommodate future operations and storage needs as well as mission changes.
Areas that can be found in warehouses and distribution centers include the following:
Other areas can be site specific.
Design criteria (temperature, humidity, noise, etc.) for warehouses are space specific; the
designer should refer to the relevant sections and chapters (e.g., the section on Office
Buildings for office and administration areas). For conditioned storage areas, the special
requirements of the product stores dictate the design conditions.
Outdoor air for ventilation of office, administration, and support areas should be based on local
code requirements or ASHRAE Standard 62.1. For general warehouses
where special ventilation or minimum ventilation rates are not specifically defined, Standard 62.1 can be used as the criterion for minimum outdoor air. To
define the specific ventilation and exhaust design criteria, consult local applicable
ventilation and exhaust standards. Table 6-1 of Standard 62.1-2022
recommends 0.47 L/(s · m2) of ventilation as a
design criterion for warehouse ventilation, although this amount may be insufficient when stored
materials have harmful emissions.
Given the variety of warehouses facilities, every case should be analyzed carefully. In general,
internal loads from lighting, people, and miscellaneous sources are low. Most of the load is
thermal transmission and infiltration. An air-conditioning load profile tends to flatten where
materials stored are massive enough to cause the peak load to lag. In humid climates, special
attention should be given to the sensible and latent loads’ variations for cases where the
warehouse or distribution center is conditioned or cooled by thermostatically controlled
packaged HVAC equipment. In these climates, it is common to satisfy the space temperature (i.e.,
very low or no sensible cooling load), but, because of infiltration of moist air and without
proper cooling (i.e., the cooling equipment is off), for space humidity to be unacceptably high.
Most warehouses are only heated and ventilated. Forced-flow unit heaters may be located near
entrances and work areas. Large central heating and ventilating units are also widely used. Even
though comfort for warehouse workers may not be considered, it may be necessary to keep the
temperature above 4°C to protect sprinkler piping or stored materials from
freezing.
A building designed for adding air conditioning at a later date requires less heating and is more
comfortable. For maximum summer comfort without air conditioning, excellent ventilation with
noticeable air movement in work areas is necessary. Even greater comfort can be achieved in
appropriate climates by adding roof-spray cooling. This can reduce the roof’s surface
temperature, thereby reducing ceiling radiation inside. Low- and high-intensity radiant heaters
can be used to maintain the minimum ambient temperature throughout a facility above freezing.
Radiant heat may also be used for occupant comfort in areas permanently or frequently open to
the outdoors.
If the stored product requires specific inside conditions, an air-conditioning system must be
added. Using only ventilation may help maintain lower space temperatures, but care should be
taken not to damage the stored product with uncontrolled humidity. Direct or indirect
evaporative cooling may also be an option.
Systems and Equipment Selection
Selection of HVAC equipment and systems depends on type of warehouse. As indicated previously,
the warehouse might need only heating/cooling in admin areas, or in some cases, highly
sophisticated HVAC systems to address special ambient conditions required by the product stored
in this warehouse. The same principles and procedures of selecting the HVAC systems described in
the office building section of this chapter should be followed.
Selection by Application. Table
6 depicts typical systems applied for warehouse facilities. Centralized systems refer to
warehouses where central chilled-water and/or hot-water/steam system is available. Decentralized
systems are typically direct expansion (DX) systems with gas-fired heating or other available
heating source.
Special systems are typically required when special ambient conditions have to be maintained:
usual examples are desiccant dehumidification, mechanical dehumidification, and humidification.
In hot and humid climates, a combination of desiccant-based dehumidification equipment along with
standard DX, packaged, single-zone units can be considered. This approach allows separation of
sensible cooling load from latent load, thereby enhancing humidity control under most ambient
conditions, reducing energy consumption, and allowing optimal equipment sizing and use.
Total building electromechanical space requirements vary based on types of systems planned.
Typically, the HVAC equipment can be roof mounted, slab, indoor, or ceiling mounted. Ductwork
and air discharge plenums usually are not concealed; often, the systems are free discharge.
Forklifts and trucks powered by gasoline, propane, and other fuels are often used inside
warehouses. Proper ventilation is necessary to alleviate build-up of CO and other noxious fumes.
Proper ventilation of battery-charging rooms for electrically powered forklifts and trucks is
also required.
4. SUSTAINABILITY AND ENERGY EFFICIENCY
In the context of this chapter, sustainable refers to a building that minimizes the use of energy,
water, and other natural resources and provides a healthy and productive indoor environment (e.g.,
IAQ, lighting, noise). The HVAC&R designer plays a major role in supporting the design team in
designing, demonstrating, and verifying these goals, particularly in the areas of energy efficiency
and indoor environmental quality (mainly IAQ).
Several tools and mechanisms are available to assist the HVAC&R designer in designing and
demonstrating sustainable commercial facilities; see the References and Bibliography in this
chapter, the Sustainability and Energy Efficiency section in Chapter 8, and Chapter 35 in the 2021
ASHRAE Handbook—Fundamentals. ASHRAE Standard 189.1 provides guidance toward sustainable solutions.
Energy standards such as ANSI/ASHRAE/IESNA Standard 90.1 and local
energy codes should be followed for minimum energy conservation criteria. Note that additional
aspects such as lighting, motors/drives, building envelope, and electrical services should also
be considered for energy reduction. Energy procurement/supply-side opportunities should also be
investigated for energy cost reduction. Table 18 in Chapter 8 depicts a list of selected
energy conservation opportunities.
Energy Efficiency and Integrated
Design Process for Commercial Facilities
The integrated design process (IDP) is vital for the design of high-performance commercial
facilities. For background and details on integrated building design (IBD) and IDP, see Chapter
60.
Unlike the sequential design process (SDP), where the elements of the built solution are defined
and developed in a systematic and sequential manner, IDP encourages holistic collaboration of
the project team during the all phases of the project, resulting in cost-effective and
environmentally friendly design. IDP responds to the project objectives, which typically are
established by the owner before team selection. Typical IDP includes the following elements:
-
Owner planning
-
Predesign
-
Schematic design
-
Schematic design
-
Design development
-
Construction documents
-
Procurement
-
Construction
-
Operation
Detailed information on each element can be found in Chapter
60.
In high-performance buildings, these objectives are typically sustainable sites, water
efficiency, energy and atmosphere quality, materials and resources, and indoor environmental
quality. These objectives are the main components of several rating systems. Energy use
objectives are typically the following:
-
Meeting minimum prescriptive compliance (mainly local energy codes, ASHRAE Standard 90.1, etc.)
-
Improving energy performance by an owner-defined percentage beyond the applicable
code benchmark
-
Demonstrating minimum energy performance (or prerequisite) and enhanced energy
efficiency (for credit points) for sustainable design rating [e.g., U.S. Green
Building Council (USGBC) Leadership in Energy and Environmental Design
(LEED®)]
-
Providing a facility/building site energy density [e.g., energy utilization index
(EUI)] less than an owner-defined target [e.g., U.S. Environmental Protection Agency
(EPA) ENERGY STAR guidelines)
-
Provide an owner-defined percentage of facility source energy from renewable energy
Building energy modeling has been one of the most important tools in the process of IDP and
sustainable design. Building energy modeling uses sophisticated methods and tools to estimate
the energy consumption and behavior of buildings and building systems. To better illustrate the
concept of energy modeling, the difference between HVAC sizing and selection programs and energy
modeling tools will be described.
Design, sizing selection, and equipment sizing tools are typically used for design and sizing of
HVAC&R systems, normally at the design process.
Examples include cooling/heating load calculations tools, ductwork design software, piping
design programs, acoustics software, and selection programs for specific types of equipment. The
results are used to specify cooling and heating capacities, airflow, water flow, equipment size,
etc., during the design as defined and agreed by the client.
Energy modeling [also known as building modeling and simulation (BMS)] is used to model the
building’s thermal behavior and the building energy systems’ performance. Unlike
design tools, which are used for one design point (or for sizing), the building energy
simulation analyzes the building and the building systems up to 8760 times: hour by hour, or
even in smaller time intervals.
A building energy simulation tool is a computer program consisting of mathematical models of
building elements and HVAC&R equipment. To run a building energy simulation, the user must
define the building elements, equipment variables, energy cost, etc. The simulation engine then
solves mathematical models of the building elements, equipment, and so on 8760 times (one for
every hour), usually through a sequential process. Common results include annual energy
consumption, annual energy cost, hourly profiles of cooling loads, and hourly energy
consumption. Chapter 19 of the 2021 ASHRAE
Handbook—Fundamentals provides detailed information on energy modeling
techniques.
Typically, energy modeling tools must meet minimum requirements to be accepted by rating
authorities such as USGBC or local building codes. The following is typical of minimum modeling
capabilities:
-
8760 h per year
-
Hourly variations in occupancy, lighting power, miscellaneous equipment power,
thermostat set points, and HVAC system operation, defined separately for each day of
the week and holidays
-
Thermal mass effects
-
Ten or more thermal zones
-
Part-load performance curves for mechanical equipment
-
Capacity and efficiency correction curves for mechanical heating and cooling
equipment
-
Air-side economizers with integrated control
-
Design load calculations to determine required HVAC equipment capacities and air and
water flow rates in accordance with generally accepted engineering standards and
practice
-
Tested according to ASHRAE Standard 140
Energy modeling is typically used in the following ways:
-
As a decision support tool for energy systems in new construction and retrofit
projects; that is, it allows analyzing several design alternatives and the selection
of the optimal solution for a given criterion
-
To provide vital information to the engineer about the building behavior and systems
performance during design
-
To demonstrates compliance with energy standards such as ASHRAE Standard 90.1 (energy cost budget method)
-
To support USGBC LEED certification in the Energy and Atmosphere (EA) section
-
To model existing buildings and systems and analyzing proposed energy conservation
measures (ECMs) by performing calibrated simulation
-
Demonstrate energy cost savings as part of measurements and verification (M&V)
protocol (by using calibrated simulation procedures)
Energy modeling is used intensively in LEED for New Construction (USGBC 2009), Energy &
Atmosphere (EA), prerequisite 2 (minimum energy performance), and for EA credit 1 (Optimize
Energy Performance). An energy simulation program (with the requirements shown above) along with
ASHRAE Standard 90.1 is used to perform whole-building energy
simulation for demonstrating energy cost savings. The number of credits awarded is in
correlation to the energy cost reduction.
Energy Benchmarking and
Benchmarking Tools
Energy benchmarking is an important element of energy use evaluation and tracking. It involves
comparing building normalized energy consumption to that of other similar buildings. The most
common normalization factor is the gross floor area. Energy benchmarking is less accurate then
other energy analysis methods, but can provide a good overall picture of relative energy use.
Relative energy use is commonly expressed by the energy utilization index (EUI), which is the
energy use per unit area per year. Typically, EUI is defined in terms of MJ/m2
per year. In some cases, the user is interested in energy cost benchmarking, which is
known as the cost utilization index (CUI). CUI units are $/m2 per year.
It is important to differentiate between site EUI (actual energy used on site) and source EUI
(energy used at the energy source); about two-thirds of the primary energy that goes into an
electric power plant is lost in the process as waste heat.
One of the most important sources of energy benchmarking data is the Commercial Building Energy
Consumption Survey (CBECS) by the U.S. Department of Energy’s Energy Information
Administration (DOE/EIA). Table 2 of Chapter 37 shows an
example of EUI calculated based on DOE/EIA 2003 CBECS; the mean site EUI for mixed-use office
space is 89 MJ/(m2 · yr). Other EUIs for commercial
facilities can be found in the same table.
Common energy benchmarking tools include the following:
Comprehensive information on energy benchmarking and available benchmarking tools can be found in
Glazer (2006) and Chapter 37.
Combined Heat and Power in
Commercial Facilities
Combined heat and power (CHP) plants and building cooling heating and power (BCHP) can be
considered for large facilities such as large office buildings and campuses and airports when
economically justifiable. Chapter 7 of
the 2020 ASHRAE Handbook—HVAC
Systems and Equipment and other sources such as Meckler and Hyman (2010),
Orlando
(1996), and Petchers (2002) provide information on CHP systems. Additional Internet-based
sources for CHP include the following:
Maor and Reddy (2008) show a procedure to optimize the size of the prime mover and thermally
operated chiller for large office buildings by combining a building energy simulation program
and CHP optimization tools.
CHP systems can be applied in large district cooling and heating facilities and infrastructure to
use waste heat efficiently. The type of the prime mover is heavily dependent on the electrical
and thermal loads, ability to use waste heat efficiently, and utility rates. Table 1 in Chapter
7 of the 2020 ASHRAE Handbook—HVAC Systems and
Equipment
provides information on the applicability of CHP.
Renewable energy (RE) technologies, including solar, wind, and biomass, can be considered when
applicable and economically justifiable. Renewable energy use can add LEED credits (USGBC 2009)
under Energy and Atmosphere (credit 2), depending on the percentage of renewable energy used.
Given the increased number and popularity of solar systems, only these systems will be discussed
in this chapter. Geothermal energy is also considered to be renewable energy; these systems are
discussed earlier in this chapter, and in more detail in Chapter 35.
Solar/Photovoltaic. Photovoltaic (PV) technology is
the direct conversion of sunlight to electricity using semiconductor devices called solar cells.
Photovoltaic are almost maintenance-free and seem to have a long lifespan. Given the longevity,
no pollution, simplicity, and minimal resources, this technology is highly sustainable, and the
proper financing mechanisms can make this system economically justifiable.
Airport facilities can be considered good candidates
for PV technology for the following reasons:
-
Large, low-rise buildings with available roof for PV collectors
-
Little or no shading
-
Large open area (open areas, parking lots, etc.)
-
Hours and seasons of operation
The most common technology in use today is single-crystal PV, which uses wafers of silicon wired
together and attached to a module substrate. Thin-film PV, such as amorphous silicon technology,
uses silicon and other chemicals deposited directly on a substrate such as glass or flexible
stainless steel. Thin films promise lower cost per unit area, but also have lower efficiency and
produce less electricity per unit area compared to single-crystal PVs. Typical values for DC
electrical power generation are around 0.56 W/m2 for thin film and up to
1.4 W/m2 for single-crystal PV.
PV panels produce direct current, not the alternating current used to power most building
equipment. Direct current is easily stored in batteries; an inverter is required to transform
the direct current to alternating current. The costs of an inverter and of reliable batteries to
store electricity increase the overall cost of a system, which is usually $5 to $7/W (Krieth and
Goswami 2007).
Another option is concentrated PV (CPV). CPV uses high-concentration lenses or mirrors to focus
sunlight onto miniature solar cells. CPV systems must track the sun to keep the light focused on
the PV cells. The main advantage of this system is higher efficiency than other technologies.
Reliability, however, is an important technical challenge for this emerging technology: the
systems generally require highly sophisticated tracking devices.
Being able to transfer excess electricity generated by a photovoltaic system back into the
utility grid can be advantageous. Most utilities are required to buy excess site-generated
electricity back from the customer. In many states, public utility commissions or state
legislatures have mandated netmetering, which means
that utilities pay and charge equal rates regardless of which way the electricity flows. A good
source of rebates and incentives in the United States for solar systems and other renewable
technologies is the Database of State Incentives for Renewable and Efficiency (DSIRE), available
at www.dsireusa.org/ (North
Carolina State University 2011). DSIRE is a comprehensive source of information on state, local,
utility, and federal incentives and policies that promote renewable energy and energy
efficiency, as well as state requirements for licensed solar contractors.
PV systems should be integrated during the early stages of the design. In existing facilities, a
licensed contractor can be employed for a turnkey project, which includes sizing, analysis,
economic analysis, design documents, specifications, permits, and documentation for incentives.
Available tools for analysis during design and installation of PV systems include the following:
-
PVsyst, a PC software package for the study, sizing, simulation and data analysis of
complete PV systems (University of Geneva 2010) at www.pvsyst.com
-
Hybrid Optimization Modeling Software (HOMER 2010), a program for analyzing and
optimizing renewable energy technologies (www.homerenergy.com/)
-
RETScreen (Natural Resources Canada 2010), a free decision support tool (which
supports 35 languages) developed to help evaluate energy production and savings,
costs, emission reductions, financial viability, and risk for various types of
renewable energy technologies, at www.retscreen.net/ang/home.php
-
eQUEST (Quick Energy Simulation Tool), a full-scale building energy simulation
program capable of performing a complete building energy evaluation, at www.doe2.com/
Financing PV projects in the public sector can be more complex because of tax exemptions and
efficient allocation of public funds and leverage incentives. The primary mechanism for
financing public-sector PV projects is a third-party ownership model, which allows the public
sector to take advantage of all the federal tax and other incentives without large up-front
outlay of capital. The public sector does not own the solar PV, but only hosts it on its
property. The cost of electrical power generated is then secured at a fixed rate, which is lower
than the retail price for 15 to 25 years. Cory et al. (2008) discuss solar photovoltaic
financing for the public sector in detail.
Solar/Thermal. Some commercial facilities can consider
active thermal solar heating systems. Solar hot-water systems usually can reduce the energy
required for service hot water. Solar heating design and installation information can be found
in ASHRAE (1988, 1991). Chapter 37 of
the 2020 ASHRAE Handbook—HVAC
Systems and Equipment and Krieth and Goswami (2007) are good sources of
information
for design and installation of active solar systems, as are Web-based sources such as U.S.
Department of Energy’s Energy Efficiency and Renewable Energy page at www.energy.gov/eere/renewables/solar.
Value Engineering and Life-Cycle
Cost Analysis
Use of value engineering (VE) and life-cycle cost analysis (LCCA) studies is growing in all types
of construction and as part of the integrated design process (IDP). VE and LCCA are logical,
structured, systematic processes used as decision support tools to achieve overall cost
reduction, but they are two distinct tools (Anderson et al. 2004).
Value engineering refers to a process where the
project team examines the proposed design components in relation to the project objectives and
requirements. The intent is to provide essential functions while exploring cost savings
opportunities through modification or elimination of nonessential design elements. Examples are
alternative systems, and substitute equipment. VE typically includes seven steps, as shown in
Figure 11 of Chapter 8.
Life-cycle cost analysis is used as part of VE to
evaluate design alternatives (e.g., alternative systems, equipment substitutions) that meet the
facility design criteria with reduced cost or increased value over the life of the facility or
system.
The combination of VE and LCCA is suitable for public facilities, which are often government
funded and intended for longer lifespans than commercial facilities. Unfortunately, these tools
often are not included in the early stages of the design, which results in a last-minute effort
to reduce cost and stay within the budget, compromising issues such as energy efficiency and
overall value of the facility. To avoid this, VE and LCCA should be deployed in the early stages
of the project.
LCCA is recommended as part of any commercial building construction for economic evaluation. Chapters 37 and 58 discuss LCCA in detail. Other
methodologies such as simple payback should be avoided because of inaccuracies and the need to
take into account the time value of money. Life-cycle cost is more accurate because it captures
all the major initial costs associated with each item, the costs occurring during the life of
the system, and the value of money for the entire life of the system.