The idea of using pressurization to prevent smoke infiltration of stairwells began to attract attention
in the late 1960s. This concept was followed by the idea of the pressure sandwich (i.e., venting or
exhausting the fire floor and pressurizing the surrounding floors). Frequently, a building’s HVAC
system is used for this purpose. This chapter focuses on smoke control systems in buildings, including
the relationship between smoke control and HVAC. A smoke control
system is an engineered system that modifies smoke movement for the protection
of building occupants, firefighters and property. The focus of code-mandated smoke control is life
safety.
For an extensive technical treatment of smoke control and related topics, see the Handbook of Smoke Control Engineering (Klote et al. 2023), referred to in this
chapter as the Smoke Control Handbook. For those interested in the
theoretical foundations of smoke control, the Smoke Control Handbook
includes an appendix of derivations of equations.
The objective of fire safety is to provide some degree of protection for a building’s occupants,
the building and property inside it, and neighboring buildings. Various forms of analysis have been used
to quantify protection. Specific life safety objectives differ with occupancy; for example, nursing
homes have different requirements than office buildings do.
Two basic approaches to fire protection are (1) to prevent fire ignition and (2) to manage fire effects.
Figure 1 shows a decision
tree for fire protection. Building occupants and managers have the primary role in preventing fire
ignition, though the building design team may incorporate features into the building to support this
effort. Because it is impossible to prevent fire ignition completely, managing fire’s effects is
significant in fire protection design. Examples include compartmentation, suppression, control of
construction materials, exit systems, and smoke control. The SFPE Handbook of Fire
Protection Engineering (SFPE 2016) contains detailed fire safety information.
Historically, fire safety professionals have considered the HVAC system a potentially dangerous
penetration of natural building membranes (walls, floors, etc.) that can readily transport smoke and
fire. For this reason, HVAC has traditionally been shut down when fire is discovered; this prevents fans
from forcing smoke flow, but does not prevent ducted smoke movement caused by buoyancy, stack effect, or
wind. Smoke control methods have been developed to address smoke movement; however, smoke control should
be viewed as only one part of the overall building fire protection system.
3. FIRE AND SMOKE DAMPERS
Dampers are used for one or more of the following purposes: (1) balancing flow by adjusting airflow
in HVAC system ducts, (2) controlling flow (for HVAC purposes), (3) resisting passage of fire (fire dampers), (4) resisting heat transfer (ceiling radiation dampers), and (5) resisting passage of
smoke (smoke dampers). Dampers that are intended to
resist the passage of both fire and smoke are called combination fire and smoke dampers. All dampers should be installed in
accordance with manufacturer’s recommendations. For more detailed information about dampers,
including pressure losses, flow characteristics, actuators, installation, and balancing, see Felker
and Felker (2009).
The UL Standard 555 series (555, 555S, and 555C) includes reliability
testing provisions for each type of damper, the heat-responsive device, and the actuator (if used).
Among the tests are cycling (20,000 full cycles for two-position dampers and
100,000 cycles for modulating dampers), structural integrity, salt spray for
accelerated lifespan testing, hose stream spray, elevated temperatures, and leakage.
Fire dampers are intended to prevent the spread of flames from one part of the building to
another through the ductwork. They are not expected to prevent airflow between building spaces,
because gaps of up to 3/8 in. are allowed for operating clearances. Fire dampers
are rated to indicate the time they can be exposed to flames and still maintain their integrity,
with typical ratings of 3 h, 1.5 h, 1 h, and less than 1 h. Fire dampers are two-position
devices (open or closed), and are usually of either the multiblade (Figure
2) or curtain design (Figure 3). Most multiblade fire dampers
are held open by a fusible link and are spring loaded. In a fire, hot gases cause this link to
come apart so that the spring makes the blades slam shut. Some applications use other
heat-responsive devices in place of fusible links. Typically, curtain dampers are also held open
by a fusible link that comes apart when heated. Vertical static curtain dampers often rely on
gravity to make the blades close off the opening, but horizontal (ceiling) and all dynamic
curtain dampers must have spring closure. Dynamic dampers are for applications where the damper
may be required to close against airflow, such as an HVAC system that remains operational for
smoke control purposes. In the United States, fire dampers are usually made and labeled in
accordance with UL Standard 555. This standard addresses fire
dampers intended for use (1) where air ducts penetrate or terminate at openings in walls or
partitions, (2) in air transfer openings, and (3) where air ducts extend through floors.
Ceiling Radiation Dampers
Ceiling radiation dampers are designed and tested to UL Standard
555C. These dampers prevent heat transfer; they have some resistance to fire and smoke, but are
not tested for fire and smoke passage.
Smoke dampers are intended to seal tightly to prevent the spread of smoke from one part of the
building to another through the ductwork, and to allow an engineered smoke control system to
build up pressures across zone boundaries. A smoke damper is not required to withstand high
temperature and will not prevent a fire from spreading. Smoke dampers are of the multiblade
design (Figure 2), and may be listed for either
two-position (open and closed) or modulating service. Smoke dampers listed for modulating
service can be used as combination smoke and HVAC dampers.In the United States, smoke dampers
are usually made and classified for leakage in accordance with UL Standard 555S. This standard includes construction requirements; air
leakage tests; and endurance tests of cycling, temperature degradation, salt-spray exposure, and
operation under airflow. Combination fire and smoke dampers comply with the dynamic fire damper
requirements of UL Standard 555 and with the smoke damper
requirements of UL Standard 555S.
Corridor dampers are combination fire and smoke dampers that are tested for horizontal
installation in ceilings. They have sleeves designed for this application and allow use of front
grilles for access to the damper and actuator. Corridor dampers need to be tested to UL Standards 555 and 555S for 1 h at 150 fpm.
Periodic Testing of Dampers
All the dampers discussed above need a periodic testing. This program needs to include (1) damper
tests at regular intervals, (2) repair of any deficiencies in a timely manner, and (3) record
keeping of all damper tests, damper deficiencies uncovered, and damper repairs.
A smoke control system needs to be designed so that it is not overpowered by the driving forces that
cause smoke movement: stack effect, buoyancy, expansion, wind, forced ventilation, and elevator
piston effect. In a building fire, smoke is usually moved by a combination of these forces.
It is common to have an upward flow of air in building shafts during winter. These shafts include
stairwells, elevator shafts, dumbwaiters, and mechanical shafts. The upward flow is caused by
the buoyancy of warm air relative to the cold outdoor air. This upward flow is similar to the
upward flow in smoke stacks, and it is from this analogy that the upward flow in shafts got the
name stack effect. In summer, flow in shafts is downward. Upward flow in shafts is called normal stack
effect, and downward flow is called reverse
stack effect.
Figure
4 shows both kinds of stack effect. In normal stack effect, air flows into the building
below the neutral plane, flows up building shafts, and out of the building above the neutral
plane. The neutral plane is a horizontal plane where pressure inside the shaft equals outdoor
pressure, and is often near the midheight of a building.
At standard atmospheric pressure, the pressure difference caused by either normal or reverse
stack effect is expressed as
where
| ΔpSO = pressure difference from shaft to
outdoors, in. of water |
| TS = absolute temperature of shaft,
°R
|
| TO = absolute temperature of outdoors
°R
|
| z = distance above neutral plane, ft |
Figure
5 diagrams the pressure difference between a building shaft and the outdoors. A positive
pressure difference indicates that shaft pressure is higher than the outdoor pressure, and a
negative pressure difference indicates the opposite. For a building 200 ft tall
with a neutral plane at midheight, an outdoor temperature of 0°F (460°R),
and an indoor temperature of 70°F (530°R), the maximum pressure difference
from stack effect is 0.22 in. of water. This means that, at the top of the
building, pressure inside a shaft is 0.22 in. of water greater than the outdoor
pressure. At the base of the building, pressure inside a shaft is 0.22 in. of water
lower than the outdoor pressure.
Smoke movement from a building fire can be dominated by stack effect. In a building with normal
stack effect, the existing air currents (as shown in Figure
4) can move smoke considerable distances from the fire origin. If the fire is below the
neutral plane, smoke moves with building air into and up the shafts. This upward smoke flow is
enhanced by buoyancy forces from the smoke temperature. Once above the neutral plane, smoke
flows from the shafts into the upper floors of the building. If leakage between floors is
negligible, floors below the neutral plane (except the fire floor) remain relatively smoke free
until more smoke is produced than can be handled by stack effect flows.
Smoke from a fire located above the neutral plane is carried by building airflow to the outdoors
through exterior openings in the building. If leakage between floors is negligible, all floors
other than the fire floor remain relatively smoke free until more smoke is produced than can be
handled by stack effect flows. When leakage between floors is considerable, smoke flows to the
floor above the fire floor.
Air currents caused by reverse stack effect (see Figure
4) tend to move relatively cool smoke down. In the case of hot smoke, buoyancy forces
can cause smoke to flow upward, even during reverse stack effect conditions.
Caution: It is a myth that the pressure difference
caused by stack effect is nearly proportional to the temperature difference between the building and the outdoors. Instead, this pressure difference is nearly
proportional to the temperature difference between a shaft and the
outdoors. Looking at Figure
4, it is easy to see how the shaft and building temperatures might be considered
identical. Often, they are the same. However, shafts that have one or more walls on the outside
of the building tend to be relatively cold in winter and warm in summer, and this can have a
major influence on stack effect.
For a building with shafts of various heights and different shaft temperatures, the flows become
very complicated and would not resemble those in Figure
4. Each shaft could have its own neutral plane with respect to the outdoors, and may
have more than one neutral plane. Equation (1) is not applicable for such complicated buildings, but
the flows and pressures in such buildings can be analyzed by a network flow model such as CONTAM
(see the section on Computer Analysis).
High-temperature smoke has buoyancy because of its
reduced density. At sea level, the pressure difference between a fire compartment and its
surroundings can be expressed as follows:
where
| ΔpFS = pressure difference from fire
compartment to surroundings, in. of water |
| z = distance above neutral plane, ft |
| TS = absolute temperature of surroundings,
°R
|
| TF = average absolute temperature of fire
compartment, °R |
The neutral plane is the plane of equal hydrostatic pressure between the fire compartment and its
surroundings. For a fire with a fire compartment temperature at 1470°F
(1930°R), the pressure difference 5 ft above the neutral plane is
0.052 in. of water. Fang (1980) studied pressures caused by room fires during a
series of full-scale fire tests and found a maximum pressure difference of 0.064 in. of
water across the burn room wall at the ceiling. Much larger pressure differences are
possible for tall fire compartments, where the distance z from the
neutral plane can be larger.
In sprinkler-controlled fires, the temperature in the fire room remains at that of the
surroundings except for a short time before sprinkler activation. Sprinklers are activated by
the ceiling jet, which is a layer of hot gas under
the ceiling. The ceiling jet’s maximum temperature depends on the fire’s location,
activation temperature of the sprinkler, and thermal lag of the sprinkler’s
heat-responsive element. For most residential and commercial applications, the ceiling jet is
between 180 and 300°F. In Equation (2), TF is the average temperature of the fire
compartment.
For a sprinkler-controlled fire,
where
| TF = average absolute temperature of fire
compartment, °R |
| TS = absolute temperature of surroundings,
°R
|
| H = floor-to-ceiling height, ft |
| HJ = thickness of ceiling jet, ft
|
| TJ = absolute temperature of ceiling jet,
°R
|
Example 1..
For H = 8 ft, HJ = 4 in. or 0.33 ft, TS = 68 + 460 = 528°R, and TJ = 400 + 460 = 860°R, the
average absolute temperature of the fire compartment is
In Equation
(2), this value of TF and z of 5 ft results in a pressure difference of
0.002 in. of water, which is insignificant for smoke control applications.
Energy released by a fire can also move smoke by expansion. In a fire compartment with only one opening to the
building, building air flows in, and hot smoke flows out. Neglecting the added mass of the fuel,
which is small compared to airflow, the ratio of volumetric flows can be expressed as a ratio of
absolute temperatures:
where
| Vout = volumetric flow rate of smoke out of fire
compartment, cfm |
| Vin = volumetric flow rate of air into fire
compartment, cfm |
| Tout = absolute temperature of smoke leaving fire
compartment, °R |
| Tin = absolute temperature of air entering fire
compartment, °R |
For smoke at 1290°F (1750°R) and entering air at 68°F
(528°R), the ratio of volumetric flows is 3.32. Note that absolute temperatures
are used in the calculation. In such a case, if air enters the compartment at 3000
cfm, then smoke flows out at 9960 cfm, with the gas expanding to more
than three times its original volume.
For a fire compartment with open doors or windows, the pressure difference across these openings
caused by expansion is negligible. However, for a tightly sealed fire compartment, the pressure
differences from expansion may be important.
In many instances, wind can have a pronounced
effect on smoke movement within a building. The pressure that wind exerts on a wall
is
where
| pw = wind pressure, in. of water
|
| Cw = pressure coefficient |
| ρo = outdoor air density,
lbm/ft3
|
| UH = velocity at wall height H, mph |
The pressure coefficient Cw depends on wind direction,
building geometry, and local obstructions to the wind. The pressure coefficients are in the
range of –0.8 to 0.8, with positive values for windward walls and negative for leeward
walls.
Frequently, a window breaks in the fire compartment. If the window is on the leeward side of the
building, the negative pressure caused by the wind vents the smoke from the fire compartment.
This reduces smoke movement throughout the building. However, if the broken window is on the
windward side, wind forces the smoke throughout the fire floor and to other floors, which
endangers the lives of building occupants and hampers firefighting. Wind-induced pressure in
this situation can be large and can dominate air movement throughout the building.
Modern HVAC systems are built of materials intended to withstand fires, and either shut down in
the event of a fire or go into a smoke control mode of operation. For details on the latter
approach, see the section on Zoned Smoke Control.
The transient pressures and flows produced when an elevator car moves in a shaft are called piston effect, and can pull
smoke into a normally pressurized elevator lobby or elevator shaft. For a validated analysis of
piston effect, see Klote (1988) and Klote and Tamura (1986, 1987).
In the absence of stack effect or other driving forces, pressure above a rising elevator car is
higher than that below the car. For this upward-moving car, there is airflow into the shaft
below the car, and airflow out of the shaft above the car. When the car passes a floor, the
pressure difference across the elevator door on that floor suddenly drops and then increases.
For elevators with lobbies that have closed doors (enclosed lobbies), the pressure difference
across the closed lobby doors reacts in a similar way to elevator car motion.
For a car traveling from the bottom to the top of the shaft, the largest value of pressure
difference from piston effect is at the top of the shaft; for a car traveling from the top to
the bottom, the largest value is at the bottom of the shaft. This largest value of pressure
difference (called the piston effect) for an elevator with enclosed lobbies is
where
| Δpu,si = upper limit pressure difference
from shaft to building, in. of water |
| ρ = air density in hoistway, lb/ft3 |
| As = cross-sectional area of shaft,
ft2
|
| Ae = effective area, ft2
|
| U = elevator car velocity, fpm |
| Aa = free area around elevator car,
ft2
|
| Air = leakage area between building and lobby,
ft2
|
| Cc = flow coefficient for flow around car |
The flow coefficient Cc was determined experimentally at
about 0.94 for a multiple-car hoistway and 0.83 for a single-car hoistway. The free area around
the elevator car is the cross-sectional area of the shaft less the cross-sectional area of the
car. Effective areas are discussed in the section on Height Limit.
Figure
6 shows the upper limit of piston effect from the lobby to the building for normal
elevator car velocities from 100 to 1000 fpm. All elevator velocities are in this
range except for those in extremely tall buildings. Figure
6 shows that piston effect is greatest for single-car shafts, and elevators that travel
at relatively high velocities in single-car shafts have the potential for piston effect that may
adversely affect smoke control performance.
9. PRESSURIZATION SYSTEM DESIGN
The section has general information applicable to all pressurization smoke control systems. The
common pressurization smoke control systems are pressurized stairwells, pressurized elevators, and
zoned smoke control, which are discussed later. Supply air for pressurization smoke control systems
should be free or nearly free of smoke as discussed in the section on smoke feedback.
The pressure difference across a barrier must not result in door-opening forces that exceed the
maximum values stipulated in codes. For example, in the NFPA Life Safety
Code® (NFPA Standard 101), this maximum
force is 30 lb.
The force required to open a side-hinged swinging door is the sum of the forces to overcome the
pressure difference across the door and to overcome the door closer. This can be expressed as
where
| F = total door-opening force, lb |
| Fdc =force to overcome door closer and other
friction, lb |
| W =door width, ft |
| A =door area, ft2 |
| Δp =pressure difference, in. of water |
| d =offset, ft |
The offset d is the distance between where the door-opening force is
applied and the side of the door opposite the hinges (i.e., the latch side). For a lever handle,
the door-opening force can be applied where the hand grasps the lever handle. For panic
hardware, the door-opening force can be applied somewhere along the panic bar. For doors that do
not stick to the door frame and have properly lubricated hinges, Fdc is the force to overcome the door closer. For more
detailed information about door-opening forces, see Klote (2018).
Example 3.
For a side-hinged swinging door 3 ft wide by 7 ft high with a
door closer that requires 9 lb of force, and a pressure difference across
it of 0.35 in. of water. The door-opening force is applied at a lever
handle such that the offset is 3 in. The door-opening force
calculated from Equation (9) is 30 lb.
Flow and Pressure Difference
The primary equation used for analysis of pressurization smoke control systems is the orifice
equation:
Alternatively, Equation (10) can be expressed in terms of volumetric flow:
where
| m = mass flow through the path, lb/s |
| C = flow coefficient |
| A = flow area (or leakage area), ft2
|
| Δp = pressure difference across path, in. of
water |
| V = volumetric flow, cfm |
| ρ = gas density in path, lb/ft3 |
Equations (10)
and (11) are
equivalent forms of the same orifice equation. Airflow paths need to be identified and evaluated
in smoke control system design. Some leakage paths are obvious, such as cracks around closed
doors, open doors, elevator doors, windows, and air transfer grilles. Construction cracks in
building walls are less obvious but no less important.
The flow area of most large openings, such as open windows, can be calculated easily. However,
flow areas of cracks are more difficult to evaluate. The area of these leakage paths depends on
quality of work (e.g., how well a door is fitted or how weatherstripping is installed).
For many flow paths in buildings, a flow coefficient of 0.65 is used. The open doors of
pressurized stairwells commonly have stationary vortices that reduce flow significantly (Cresci
1973; Klote and Bodart 1985). These vortices are thought to be caused by asymmetric flow from
the stairs, and stationary vortices can be expected at many open doors in other locations of
smoke control systems. For open doors in stairwells, the geometric area of the opening should be
used for the flow area, with a flow coefficient of 0.35.
Typical leakage areas for walls and floors of commercial buildings are tabulated as area ratios
in Table
1. These data are based from field tests performed by the National Research Council of
Canada (Shaw et al. 1993; Tamura and Shaw 1976a, 1976b, 1978; Tamura and Wilson 1966).
Considerable leakage data through building components are also provided in Chapter 3 of the
Smoke Control Handbook.
Both the maximum and minimum allowable pressure differences across the boundaries of smoke
control should be considered. The term acceptable pressurization
applies to a system that operates within the range of minimum to maximum allowable pressure
differences. The maximum allowable pressure difference should not cause excessive door-opening
forces.
The minimum allowable pressure difference intended to prevent smoke migration across a barrier of
a smoke control system is generally stipulated by code. The smoke control system needs to be
designed to maintain this minimum design pressure difference under likely conditions of wind,
stack effect, or buoyancy of hot smoke. Pressure differences caused by wind and stack effect can
be large in the event of a broken window or an open window or door in the fire compartment.
(Windows exposed to the heat of a fire often break.) Evaluation of these pressure differences
depends on evacuation time, rate of fire growth, building configuration, and the presence of a
fire suppression system. The code-required minimum and maximum design pressure differences need
to be used. For locations with no such code requirements, the values of NFPA Standard 92 are suggested.
Computer Analysis by Network Modeling
CONTAM
(Dols and Polidoro 2016) is the de facto standard computer program for
analyzing pressurization smoke control systems. It is a network model that simulates airflow and
contaminant flow in buildings. Network modeling for smoke control dates back to the 1960s, but
these early models were subject to numerical difficulties and data input was extremely
cumbersome and time consuming. CONTAM has superior numerical routines and sophisticated data
input, and can be downloaded from the NIST website (www.nist.gov/el/energy-and-environment-division-73200/nist-multizone-modeling/download-contam)
at no cost. Because CONTAM does not solve the energy equation, the user needs to input the
temperatures of the spaces in the network.
Note that, when CONTAM is discussed in this chapter, other network models could be used instead.
Network models represent a building by a network of spaces or nodes, each at a specific pressure
and temperature. The stairwells and other shafts can be modeled by a vertical series of spaces,
one for each floor. Air flows through leakage paths (e.g., doors or windows that may be opened
or closed, partitions, floors, exterior walls, roofs) from regions of high pressure to regions
of low pressure. Airflow through a leakage path is a function of the pressure difference across
the leakage path.
In network models, air from outside the building can be introduced by a pressurization system
into any level of a shaft or into other building spaces. This allows simulating pressurization
of a stairwell, elevator shaft, stairwell vestibule, and any other building space. In addition,
any building space can be exhausted. This allows analysis of zoned smoke control systems where
the fire zone is exhausted and other zones are pressurized. The pressures and flows throughout
the building are obtained by solving conservation equations for the network. Analysis can
include the driving forces of wind, the pressurization system, and indoor-to-outdoor temperature
difference.
The primary purpose of network simulations is to determine whether a particular smoke control
system in a particular building can be balanced such that it will perform as intended. Network
models can simulate pressures and flows throughout very large and complicated building networks
with high accuracy, although the results are approximations.
There are many flow paths in buildings, including gaps around closed doors, open doors, and
construction cracks in walls, roof, and floors. These flow paths are approximated for a design
analysis. However, the approximated results can be useful in identifying problems with specific
smoke control systems, so the smoke control system or the building can be modified
appropriately. These simulations can also provide information to help size system components
such as supply fans, exhaust fans, and vents.
First-time users of CONTAM may be confused by its extensive capabilities, many of which are not
usually used for smoke control analysis. Chapter 14 of the Smoke Control
Handbook has CONTAM user information intended to help start using the software for
analysis of smoke control systems that rely on pressurization. This information includes a
section on speeding up data input.
11. PRESSURIZED STAIRWELLS
Many pressurized stairwells have been designed and built to provide a tenable environment
inside the stairwell in the event of a building fire. They also provide a smoke-free staging area
for firefighters. On the fire floor, a pressurized stairwell is intended to provide a positive
pressure difference across a closed stairwell door to prevent smoke infiltration. For stairwells in
cold climates, designers should consider treating supply air to minimize the potential of freezing
water in standpipes. Supply air for pressurized stairwells should be free or nearly free of smoke,
as discussed in the Smoke Feedback section.
Air can be supplied to a pressurized stairwell at one or several locations. A single-injection system
supplies pressurized air to the stairwell at one location, usually at the top. For tall stairwells,
single-injection systems can fail when a few doors are open near the air supply injection point,
especially in bottom-injection systems when a ground-level stairwell door is open.
Air can be supplied at multiple locations over the height of a tall stairwell. Figures
10 and 11
show two examples of multiple-injection systems that can
be used to overcome the limitations of single-injection systems. Multiple-injection systems can use
one or multiple fans. When one fan is used, air is supplied through a duct that is usually in a
separate duct shaft. However, some systems eliminate the expense of a separate duct shaft by
locating the supply duct in the stairwell itself. In such a case, ensure that the duct does not
obstruct orderly building evacuation.
Stairwell Compartmentation
Stairwell compartmentation, which is not often used, consists of dividing a stairwell into
several sections consisting of five to ten stories each; each compartment has at least one
supply air injection point. The compartments are separated by walls with normally closed doors.
The main advantage of compartmentation is that it allows acceptable pressurization of stairwells
that are otherwise too tall for acceptable pressurization. A disadvantage is the increase in
floor area needed for the walls and doors separating the stairwell sections. When the doors
between compartments are open, the effect of compartmentation is lost. For this reason,
compartmentation is inappropriate for densely populated buildings, where total building
evacuation by stairwell is planned in the event of a fire.
Pressurized stairwells with vestibules are occasionally used. The vestibules can be
unpressurized, pressurized, ventilated, or both pressurized and ventilated. Vestibules provide
an additional barrier around a stairwell, and can reduce the probability of an open-door
connection existing between the stairwell and the building.
An evacuation analysis can determine the extent to which both vestibule doors are likely to be
opened simultaneously. For densely populated buildings, it is expected that on many floors both
vestibule doors would be opened simultaneously. Therefore, vestibules may provide little benefit
of an extra barrier for densely populated buildings.
The algebraic equation method of analysis can be used to analyze a pressurized stairwell with an
unpressurized vestibule. The pressure differences and flows of stairwell systems with any kind
of vestibules, including those with openings to the outdoors and those with combinations of
supply air and exhaust air, can be analyzed by CONTAM.
System with Fire Floor Exhaust
This system can achieve acceptable pressurization of tall stairwells in very complicated
buildings. A relatively small amount of air is supplied to the stairs, and the fire floor is
exhausted such that acceptable pressurization is maintained on the fire floor where it is
needed. Floors above and below the fire floor also may be exhausted. These systems are discussed
further in the section on Zoned Smoke Control. When a CONTAM analysis shows that the
code-mandated systems cannot or are likely not to be able to achieve successful pressurization,
stairwell pressurization with fire floor exhaust could be a solution. The design analysis of
these systems should include CONTAM simulations.
Analysis of Pressurized Stairwells
Pressure differences across a stairwell tend to vary over the height of the stairwell. Figure
12 shows pressure profiles for pressurized stairwells in an idealized building (i.e., no
vertical leakage through the floors and shafts, and leakage is the same from floor to floor) and
in a more realistic building with vertical leakage through floors and an elevator shaft. This
figure is for winter. When it is cold outdoors, the pressure differences tend to be less at the
bottom of the stairwell than at the top. When it is hot outdoors, the trend is the opposite. For
both winter and summer conditions, the pressure profile for an idealized building is a straight
line.
The pressure profiles of stairs in real buildings depend on many factors, including (1) leakage
values of the building components, (2) building floor plans, (3) size of elevator shaft or
shafts and number of elevator doors, (4) presence or absence of elevator lobbies and vents, and
(5) leakage through other shafts. There are many possible shapes for such pressure profiles in
real buildings, but the complexities of airflow in buildings are such that specific patterns for
pressure profiles are unknown.
For a building with vertical leakage, flows through the floors and shafts to some extent even out
the highest and lowest pressure differences across the stairwell. The profile for a building
with vertical leakage is bounded by the extremes of the pressure profile of the idealized
building. This means that, other things being equal, the smallest pressure difference of the
idealized analysis is less than that of the realistic building, and that the largest pressure
difference of the idealized analysis is more than that of the realistic building. This is why
the algebraic equation method discussed in the section on Equations for Steady Smoke Exhaust is
conservative.
An algebraic equation method of analysis pressurized stairwells is also presented in Chapter 10
of the Smoke Control Handbook. This algebraic equation method is
based on (1) the idealized building, (2) flows calculated by the orifice equation, (3) effective
areas, and (4) symmetry. It does not account for pressure losses in the stairwell from friction,
but these losses tend to be small for stairwells when all stair doors are closed. CONTAM can
analyze pressurized stairwells much more realistically than the algebraic equation method.
Some designers size fans for pressurized stairwells using their own rules of thumb, which are
generally in the range of 300 to 550 cfm per floor. Such estimates can be
appropriate for simple buildings such as those discussed previously. The primary factor
regarding the amount of pressurization air needed is stairwell leakage. Table
2 lists the supply air needed to pressurize stairwells as a function of leakage
classification. If the fan is oversized, the amount of supply air can be adjusted during
commissioning to achieve successful pressurization. Because of the high cost of replacing
undersized fans (including electrical wiring), rules of thumb chosen by designers usually
incorporate an allowance for leakier construction than actually anticipated.
For some tall stairwells, acceptable pressurization may not be possible because of
indoor-to-outdoor temperature differences. Acceptable pressurization is more likely with systems
using untreated supply air than those using treated supply air.
The height limit is the height above which acceptable
pressurization is not possible for an idealized building. For the height limit to be applicable
to a building, all the floors of the building must be the same or relatively similar. When using
the height limit, shafts that are not pressurized are neglected. For standard atmospheric
pressure at sea level, the height limit is
where
| Hm = height limit, ft |
| FR = flow area factor |
| Δpmax = maximum design pressure difference,
in. of water
|
| Δpmin = minimum design pressure difference,
in. of water
|
| TO = absolute temperature outdoors,
°R
|
| TS = absolute temperature in stairwell,
°R
|
The flow area factor is
where
| ASB = flow area between stairwell and building,
ft2
|
| TB = absolute temperature in building,
°R
|
| ABO = flow area per stairwell between building
and outdoors, ft2 |
| TS = absolute temperature in stairwell,
°R
|
Figures 13
and 14 show
the height limit calculated from Equations (13) and (14) for winter with treated
and untreated supply air, respectively. The areas ASB and
ABO are calculated using effective areas. The effective
area of a system of flow areas is the area that results in the same flow as the system when it
is subjected to the same pressure difference over the total system of flow paths. The effective
area of any number of flow paths in parallel is
and the effective area of any number of paths in series is
where
| Ae = effective area, ft2
|
| Ai = flow area of path i, ft2 |
Two examples (Figures
15 and 16)
demonstrate evaluation of ASB and ABO. The areas on these figures include wall leakage
through construction cracks or other paths, including gaps around doors, as appropriate for each
section of wall. Figure
15 is a floor plan of a simplified open-plan office building. Because the height limit
is based on symmetry, the area ABO is on a per-stairwell
basis. Figure
15 shows the axis of symmetry, and flows and flow paths on one side of this axis are the
mirror image of those on the other side. This figure is geometrically symmetric, but the height
limit also can be used for buildings where the building is only symmetric with respect to flow.
In this figure, the areas between the building and the outdoors are A1, A2, and A3. These areas are in parallel, and based on Equation (15),
ABO = A1 + A2 + A3. The areas
between the stairwell and the building are A4 and A5, which are also in parallel. Based on Equation (15), ASB = A4 + A5.
The stairwells of Figure
16 have unpressurized vestibules. As with Figure
15, ABO = A1 + A2 + A3. Calculating ASB
involves flow areas both in parallel and in series. Equation (16) can only be
used when no air is supplied to or exhausted from the spaces in the system of series paths. The
effective area approach can be used because the only space in this path is an unpressurized
vestibule. In Figure
16, the areas A5 and A6 are in parallel, so A56 = A5 + A6. The path through the vestibule is series, so from Equation (16),
A456 = (1/A24 + 1/A256)–1/2. The paths A456 and A7 are in
parallel, so ASB = A456 + A7.
Example 4.
For the simple building of Figure 17,
(1) evaluate wind effect, (2) evaluate stack effect, and (3) determine the design
capacity of the supply fans. The height of the building and stairwells is 110
ft. The minimum and maximum design pressure differences are 0.10 and
0.35 in. of water.
Wind Effect. For this building, wind effect is not
considered to be an issue because
-
There are no windows or balcony doors that can be opened between the building and the
outdoors.
-
A centrifugal fan is used to minimize wind effect on the flow rate of pressurization
air. (Wind effect can also be minimized by other kinds of fans, although this
requires evaluation for the specific case.)
For designs where wind effect is not minimized, CONTAM is recommended for analyzing the stair
pressurization system.
Stack Effect. Because the example building is only 11
stories tall, stack effect was not an issue. For larger buildings, the impact of stack effect
should be analyzed.
The winter outdoor design temperature is TO =
10°F, and the building temperature is TB
= 70°F. The atmospheric pressure is 14.7 psi. Consider a heat
transfer factor of η = 0.15. Because the building is simple, height limit can be used to
evaluate stack effect. First, evaluate stack effect before stabilization; the first approach for
this is to examine the height limit for the stairwell if pressurization air were treated. From
Figure 14
with TO = 10°F, the smallest value of
height limit is about 140 ft when ASB/ABO is near zero. The stairwell height is 110
ft, which is less than the height limit. This means that stack effect is not an issue
before temperature stabilization; consequently, it cannot be an issue after stabilization.
Size Supply Fans: Because this building is simple, the
rule of thumb method can be used to size the fans. Generally, rules of thumb for pressurized
stairwells are in the range of 300 to 550 cfmper floor. The most important factor
to consider in choosing a rule of thumb is the stairwell leakage, which primarily consists of
the leakage of stairwell walls and stairwell doors.
Construction of the stairwell is believed to be of average leakiness or higher. Table
2 lists supply air of 235 cfm per floor for average leakage, and 550
cfm per floor for high leakage. Because of the cost of replacing an undersized fan,
the rule of thumb of 450 cfm per floor is chosen. The stairwell has 11 floors, and
fan capacity is 11(450) = 4950 cfm. Each stairwell is pressurized by one fan with
capacity of 4950 cfm
Stairwells with Open Doors
When any stair door is opened in a simple stairwell pressurization system, the pressure
difference drops significantly. When all doors are closed suddenly in such a simple system, the
pressure difference increases significantly. A compensated stairwell
pressurization system adjusts for changing conditions either by
modulating supply airflow or by relieving excess pressure. The intent is to maintain acceptable
pressurization when doors are opening and closing.
In the United States, most codes do not require pressurized stairwells to be compensated, and
such stairwells are designed to maintain pressurization only when all the stair doors are
closed. Traditionally, some engineers felt that pressurized stairwells needed to be compensated,
but research projects by Klote (2004) and Ko and Lougheed (2016) show that noncompensated
stairwell pressurization systems can maintain a tenable environment in the stairwell as long as
the door on the fire floor remains closed, even if doors on other floors are opened. In computer
simulations by Klote and fire experiments by Ko and Lougheed, the small amount of smoke that
leaked through the gaps around a closed stair door was diluted by pressurization air and a
tenable environment was maintained in the stairwell.
When compensated stairwell pressurization systems are required, the systems described by Klote et
al. (2017) can be used: barometric damper (BD), variable-air-volume (VAV), open exterior door
(OED), and exterior vent (EV) systems. As with noncompensated stairwell pressurization systems,
performance of compensated systems can be negatively affected by wind, and this needs to be
taken into account during design. Compensated stairwell pressurization systems have the failure
modes discussed in the following paragraphs.
Barometric Damper (BD) System. This system has
constant-supply airflow, which is designed to maintain acceptable pressurization with the
required number of doors open. The supply air rate is not actually constant, but varies to some
extent with pressure across the fan. For centrifugal fans, this flow variation is generally
small. However, the term constant supply is used to differentiate
this system from those where the supply air intentionally changes. When a stair door is closed,
the excess supply air is relieved to the outdoors through one or more vents with barometric
dampers.
Barometric dampers tend to chatter because of the wind. This chatter can be so annoying that
building maintenance staff sometimes wire these dampers shut to stop the noise, which can lead
to failure because of excessive stair pressurization. Because barometric dampers are usually
located on walls, wind can affect system performance more than with most other systems. If a BD
compensated stairwell pressurization system is to be used, the design needs to mitigate damper
chatter and any adverse wind effects.
Variable-Air-Volume (VAV) System. In a VAV compensated
stairwell system, the flow rate of supply air to the stairwell is adjusted to account for
opening and closing of doors. The flow of supply air to the stairwell is controlled by multiple
static pressure sensors that sense the pressure difference between the stairwell and the
building. When doors are opened, the stairwell pressure drops and the flow rate of supply air is
increased to achieve at least the minimum design pressurization. When all the doors are closed,
stair pressure increases, and supply air is reduced to prevent excessive pressure differences.
When a door is opened in the VAV system, the pressure in the stairwell drops, and it takes about
3 to 7 s for the pressure to recover to the initial value (Tamura 1990).
When the last open door in a VAV system closes, there is a pressure spike that can be on the
order of 1 in. of water, which is extremely high compared to the usual pressure
differences maintained by pressurized stairwells. A person encountering such a peak would
probably not be able to open the stair door, but they could open it a minute or so later
provided they knew to try. A person encountering such a peak may think the stair door was
locked, and might not try to open it again.
Wind can have an unusual and serious impact on VAV systems. During design analysis, engineers
have encountered very high pressure differences during some wind conditions. For example, when
an exterior door is opened during the design wind speed, there can be so much supply air that
the pressure difference across some stair doors can exceed the maximum design value by as much
as 100%, making it impossible or extremely difficult for occupants to enter the stairwell.
A VAV compensated stairwell pressurization system design needs to deal with both the pressure
spike and the effects of wind on the system. To address these potential failure modes, the
design analysis needs to include simulations by network analysis computer program such as
CONTAM.
Open Exterior Door (OED) System. The open exterior
door (OED) system has constant-supply airflow, and an exterior stairwell door that opens
automatically on system activation. This system is sometimes called the Canadian system, because
it originated in Canada and has been used extensively there. By eliminating opening and closing
of the exterior stairwell door during system operation, the OED system eliminates the major
source of pressure fluctuations. However, there can be security concerns about exterior doors
that open automatically, so OED systems are suggested only for applications where this security
issue is not a concern or where the concerns can be resolved with other measures.
Exterior Vent (EV) System. The open exterior vent (EV)
system is an alternative when security concerns prohibit using the OED system. An EV system has
constant-supply airflow and an exterior vent that opens automatically upon system activation.
The intent of this vent is to minimize the effect of opening and closing the exterior stair
door. To minimize the effect of wind, it is suggested that the vent be near (and facing the same
direction as) the exterior door. The size of the vent can be determined by CONTAM simulations.
12. PRESSURIZED ELEVATORS
The elevator pressurization systems discussed in this chapter are intended to prevent smoke from
flowing from the fire floor through an elevator shaft and threatening life on floors away from the
fire floor. Because these systems have air supplied to the elevator shaft, they are also called
elevator shaft pressurization systems. Many concepts discussed in this
chapter are from Klote and Turnbull (2020). For elevator evacuation, see Chapter 12 of the Smoke
Control handbook.
Often, pressurized elevators are in buildings that also have pressurized stairwells, and this section
considers that these pressurization systems operate together. In situations where pressurized
elevators are the only pressurization smoke control system in a building, the information in this
section may still be useful. Supply air for pressurized elevators should be free or nearly free of
smoke, as discussed in the Smoke Feedback section.
The information discussed in the section on Elevator Piston Effect can be used to evaluate the
influence of piston effect on performance of pressurized elevator systems. The piston effect
produces a pressure spike when a car passes a particular floor, and this happens for only a few
seconds during the run of an elevator. For elevators in multiple-car shafts with car velocities less
than 1,000 fpm, or for those in single-car shafts with car velocities less than
500 fpm, piston effect should not adversely affect performance of elevator
pressurization.
Elevator pressurization systems need to be designed to work with firefighting operations. During a
building fire, the elevators are recalled to the ground floor and the elevator doors are left open
in accordance with ASME A17.1, Safety Code for Elevators and Escalators
(ASME 2019). When the fire is detected on the ground floor, ASME A17.1 requires that the elevators
are recalled to an alternate egress floor, and the elevator doors are left open on that floor. To
allow firefighters to quickly enter and leave the building, the fire service typically blocks open a
number of exterior doors except when these doors open automatically upon fire detection.
Design of elevator pressurization systems can be simplified by having a number of exterior doors on
the ground floor that open automatically on detection of a fire. When such automatic opening doors
are used, the elevator pressurization system can be designed to operate with open exterior doors and
without concern for closed exterior doors on the ground floor.
Often elevator pressurization can be challenging because the very large amounts of supply air needed
to pressurize elevators results in unusual airflows and pressure differences in buildings. Elevator
pressurization systems with pressurized stairwells are the focus of most of this section, because
this combination poses more challenges than elevator pressurization without pressurized stairwells.
The systems discussed here are (1) the basic system (BS), (2) the exterior vent (EV) system, (3)
the floor exhaust (FE) system, and (4) the ground floor lobby (GL) system. A concern with
pressurized elevators in a building without pressurized stairwells is that air from the
elevators could force smoke into the stairs.
The concepts of simple and complicated buildings regarding stairwell pressurization are not
applicable to elevator pressurization. The complex nature of airflow in buildings with elevator
pressurization is such that it is suggested that design analysis of elevator pressurization
systems be done with network modeling such as CONTAM.
For this section, the design pressure differences listed in Table
3 are used. This table lists minimum and maximum design pressure differences for
pressurized elevators and stairwells. Failure of a system to operate within these minimum and
maximum values on all floors is considered unsuccessful pressurization. Some local codes may
have different pressure difference requirements which need to be followed.
In the basic system, each elevator shaft has one or more dedicated fans that supply
pressurization air. Figure
18 shows a building with a pressurized elevator. This building also has two pressurized
stairwells. Each pressurized stairwell also has one or more dedicated fans. In this figure, the
elevator pressurization and stairwell pressurization systems are single injection systems, but
they can be multiple injection systems. For the discussions in this section, the stairwells
systems are not compensated systems, but it may be possible to use compensated pressurized
stairwell systems with the basic elevator pressurization system.
For some basic systems, it may be impossible to balance the system to achieve successful
pressurization, but one of the more complex systems discussed later usually can be successfully
used. Because the basic elevator system is the simplest of these elevator pressurization
systems, it tends to be the most reliable and least expensive. For information about system
reliability, see Chapter 2 of the Smoke Control Handbook.
Challenging Systems:
The supply air from the elevators flows into the building and then through the building envelope
and to the outdoors. When the supply air to the elevator shaft is relatively large, there can be
failure to achieve successful pressurization of the basic system. A common failure pattern of a basic elevator pressurization system is that the
pressure difference at and near the ground floor exceeds the maximum design criteria. This
failure is related to the high airflow at the ground floor from elevators and out the open
exterior doors. The airflow from pressurized stairwells makes this failure more likely.
Example Buildings with the Basic
System
Some buildings are more challenging than others, and this can be shown by comparing the basic
system in an example 14-story office building (Figure
19) and an example 12-story condominium building (Figure
20). Both buildings are old and are being extensively renovated. For this reason, the
exterior walls are considered of average leakage classification discussed below. The performance
of the basic system in these buildings was analyzed using CONTAM.
For these simulations, the pressure difference criteria are listed in Table
3. The leakage values and flow coefficients used for these simulations are listed in Tables
4 and 5.
For the CONTAM simulations of the example building, supply air was injected only at the top of
the elevator shafts, but for stairwells, about half the supply air was injected at the top of
the stairs and the rest at the second floor. For more details about these example building
simulations, see Chapter 11 of the Smoke Control Handbook.
Figure
21 is the graph of the elevator pressure differences for the two example buildings in
summer conditions, and the graph (not shown) of the elevator pressure differences for the
example buildings in winter looks similar. The shaded area on the graph is the region of
acceptable pressurization which is 0.10 to 0.25 in of water. This graph shows that
elevator pressurization in the condominium building is successful, but elevator pressurization
in the office building is unsuccessful. The elevator pressurization of the office building
illustrates the common failure pattern mentioned above for basic elevator pressurization
systems. If the condominium building had exterior walls of tight leakage classification, the
basic system would fail in that building.
Because office buildings are more likely to need a complex elevator pressurization system than
residential buildings, the discussion that follows about complex systems (EV, FE and GL) focuses
on systems in office buildings, but much of the discussion is applicable to other kinds of
buildings.
Exterior Vent (EV) System
The idea of this system is to use vents in the exterior walls to increase the leakiness of the
building envelope such that successful pressurization would be achieved. These vents are on all
floors except the ground floor. As already mentioned, a number of exterior doors are open on the
ground floor, so there is no need for wall vents on the ground floor. The wall vents are
normally closed, but they are opened upon elevator (and stairwell) pressurization system
activation. The wall vents should be located in a manner to minimize adverse wind effects, and
these wall vents may need fire dampers depending on code requirements. The EV system is intended
to maintain successful pressurization on all the floors served by elevators in a building.
Open Plan Office: Figure
22 shows a floor of a building with open plan offices and the EV elevator pressurization
system. The wall vents can be sized during design so that the EV system (and pressurized
stairwells) can be balanced such that successful pressurization can be achieved.
Building with Interior Partitions: Many buildings can have
interior partitions which can block or partially block airflow from the elevator lobby to the
outdoors, also interior partitions installed in a tenant space are a concern. For buildings with
interior partitions, a duct system can be installed above the ceiling can to provide a path for
airflow from the elevator lobby to the outdoors.
When the EV system is operating, air flows from the elevator lobby through the ducts and wall
vents to the outdoors.
Floor Exhaust (FE) System
The FE system deals with the building envelope issue by reducing the amount of supply air used.
In the FE system, a relatively small amount of air is supplied to the elevator shafts and the
stairwells. Also, the fire floor and the floors directly above and below the fire floor are
exhausted to achieve acceptable pressurization. Many codes stipulate successful pressurization
on all floors, and the FE system can be thought of as providing equivalent protection in that it
is intended to provide successful pressurization on the fire floor and one or two floors above
and below the fire floor.
Typically, the exhaust is through a shaft with a fan located in a mechanical floor or on the
roof, and dampers between the shaft and the floors are closed on all floors when the system is
not operating. On system activation, the dampers open on the floors to be exhausted. The outlet
of the exhaust fan needs to be located away from the inlets to the supply fans to minimize the
potential for smoke feedback into supply air.
Open Plan Office: Figure
23 shows the FE system in an open plan office floor. On the floors that are exhausted,
air flows from the elevators to the exhaust shaft, through that shaft to the outdoors. This
system needs to be designed so that the FE system can be balanced to maintain acceptable
pressurization on the fire floor, and the floors above and below the fire floor that are
exhausted.
Building with Interior Partitions: If one or more interior
partitions are likely to block airflow from the elevator lobby to the exhaust shaft, a duct
system can be installed above the ceiling can to provide a path for airflow from the elevator
lobby to the exhaust shaft.
Ground Floor Lobby (GF) System
This system has an enclosed elevator lobby on the ground floor to reduce the tendency of open
exterior doors to cause high pressure differences across the elevator shaft at the ground floor.
The GL system often has a vent between the enclosed lobby and the building with the intent of
preventing excessive pressure differences across the lobby doors. The lobby doors are the doors
between the enclosed lobby and the building.
The pressure difference across the lobby door and the elevator door depends on the area of the
vent. There is no established criterion for the maximum pressure difference across the lobby
doors, but the pressure should not be so high as to prevent the doors from remaining closed.
This value depends on the specific doors and hardware. For discussion here, a maximum pressure
difference for the lobby doors was chosen as 0.35 in of water, but this value can
be much different for specific applications. The vent needs a fire damper and a control damper
in series. The control damper can be used to adjust the flow area of the vent so it can be
balanced during commissioning. Figure
24 shows the ground floor of an open plan office building with a GL system.
In the GL system, the enclosed lobby on the ground floor protects the elevator from smoke from a
fire on the ground floor. For this reason, the minimum elevator pressure difference criterion of
Table
3 does not apply to the ground floor for a GL system. Table
6 lists the criteria that are used in this chapter for the GL system.
For fires in high-rise buildings, the fire service frequently uses the elevators for rescue and
for mobilization of firefighting equipment. When ground floor lobby doors are opened, the
pressure difference may exceed the maximum pressure difference. If this can happen for a
particular design, the fire service should be contacted to determine if this is acceptable to
them.
The floor-to-floor leakage can have a significant impact on the performance of a GL system. This
leakage consists of the leakage of the floor and that of the curtain wall gap (Table
5).
The traditional approach for HVAC systems is to shut them down during building fires, but HVAC
systems can be operated in smoke control mode during building fires. Zoned smoke control consists of
exhausting the zone of the fire and possibly pressurizing the surrounding zones. In addition to
using the HVAC system, dedicated equipment can be used for zoned smoke control. Supply air for zoned
smoke control systems should be free or nearly free of smoke, as discussed in the Smoke Feedback
section.
In zoned smoke control, a building is divided into several zones, each separated from the others by
barriers. In the event of a fire, the zone with the fire is called the smoke zone, and the others are called the nonsmoke zones. Zones bordering on the smoke zone are
called the surrounding zones. Either passive or
pressurization smoke protection is used to limit smoke spread beyond the smoke zone. Smoke control
cannot make conditions tenable in the smoke zone, and occupants should evacuate the smoke zone as
soon as possible.
Some arrangements of smoke control zones are shown in Figure
23. In this figure, the smoke zone is indicated by a minus sign, and the surrounding zones
are indicated by a plus sign. The smoke zone is often one floor of the building, but it can be the
fire floor plus the floors directly above and below the fire floor. In a relatively low, sprawling
building with several wings, the smoke zone can be part of a floor.
When separate HVAC systems serve each zone, systems distant from the smoke zone and surrounding zones
should only remain operating if the building pressurization produced by these systems does not
adversely impact zoned smoke control system performance. Otherwise, they should be shut down.
The traditional approach to zoned smoke control is to exhaust the smoke zone and to pressurize the
surrounding zones, but other approaches have been used. Although fan-powered smoke exhaust is the
most common method of treating the smoke zone, passive smoke control using smoke barriers may be
satisfactory when fan-powered exhaust is not practical. Using exterior wall vents or smoke shafts to
treat the smoke zone is not common, but these methods are discussed in Chapter 13 of the Smoke Control Handbook.
Fan-powered pressurization or passive smoke control using smoke barriers can be used for the zones
surrounding the smoke zone. Fan-powered pressurization of the surrounding zones has a negative
consequence on stairwell pressurization, as discussed in the following sections. In this section,
fan-powered pressurization is called pressurization, and fan-powered exhaust is called exhaust.
When the floors or wings of a building are divided into many rooms with normally closed doors, these
floors do not lend themselves to the traditional concept of zoned smoke control. For such
applications, a form of zoned smoke control can be used that relies on a combination of corridor
exhaust and passive smoke control using smoke barriers. The passive protection tends to minimize
smoke flow through the ceiling floor assembly during building fires. Some applications suitable for
such an approach are hotel guest floors, apartment buildings, and some office buildings.
Interaction with Pressurized
Stairs
The interaction of zoned smoke control with pressurized stairwells can have a significant effect
on pressure differences across the stairwell doors. The following discussion is about smoke
zones that are one floor and surrounding zones consisting of one floor above and one floor
below. However, the same kind of interactions can happen with smoke zones and surrounding zones
that are more than one floor.
The interaction between zoned smoke control and pressurized stairwells is shown in Figure
26. For zoned smoke control using both exhaust and pressurization, pressurization of the
surrounding zones decreases the pressure difference ΔpSB across pressurized stairwell doors on these floors.
This decreased pressure difference can result in failure of pressurized stairwells on the floors
being pressurized. However, this failure mode is eliminated by using zoned smoke control that
uses exhaust only.
Ideally, exhaust and pressurization zoned smoke control should prevent smoke from reaching the
floor above the smoke zone, and negative stairwell pressurization should not compromise
tenability of the stairwell. The effectiveness of this depends on proper identification of the
fire floor. Properly maintained fire alarm systems are very good at identifying the location of
a fire, but no system is perfect. In some fires, the first smoke detector to activate was a
floor or so above the fire floor. This can be attributed to any of the following: (1) smoke
flowing through a complex route to a floor above the fire, (2) smoke detectors not working
properly on the fire floor, and (3) signals from smoke detectors being misidentified.
Regardless of the reason, when a fire floor is incorrectly identified, the smoke zone is
incorrectly chosen. In this situation, the failure mode is that inadvertent pressurization of
the fire floor can push smoke into the stairwells (probably into all stairwells serving the fire
floor). This failure mode is more of a concern for tall buildings, which are more difficult to
pressurize acceptably, and for buildings with 10 or more stories, for which stairwell smoke
protection is more critical. Occupant density is another factor affecting the importance of
stairwell smoke protection. Because of this failure mode, it is recommended that zoned smoke
control using systems using both exhaust and pressurization not be used for tall buildings where
protection of the stairwells is especially important. Alternatively, analyze this failure mode,
including factors such as evacuation time, emergency response time, and probability of using the
firefighter’s smoke control station (FSCS) for corrective action.
Because of the lack of compartmentation in large-volume spaces, smoke protection for such spaces is
important. This chapter considers a large-volume space to be at least two stories high, such as an
atrium, exhibition center, enclosed shopping mall, arcade, sports arena, or airplane hangar.
For simplicity, the term atrium is used generically here to mean any of these
large spaces.
Most atrium smoke control systems are designed to prevent exposure of occupants to smoke during
evacuation; this is the approach described in this section. An alternative goal is to maintain
tenable conditions even when occupants have some contact with smoke, as discussed in the section on
Tenability Systems.
The following approaches can be used to manage smoke in atriums:
-
Smoke filling. This approach allows smoke to
fill the atrium space while occupants evacuate the atrium. It applies only to spaces
where the smoke-filling time is sufficient for both decision making and evacuation. For
information about people movement and evacuation time, see Chapter 4 of the Smoke Control Handbook. The filling time can be estimated
either by zone fire models or by Equations (15.1) and (15.2) in the Smoke Control Handbook.
-
Unsteady smoke exhaust. This approach exhausts
smoke from the top of the atrium at a rate such that occupants have sufficient time for
decision making and evacuation. It requires analysis of people movement and fire model
analysis of smoke filling.
-
Steady smoke exhaust. This approach exhausts
smoke from the top of the atrium to achieve a steady smoke layer height for a steady
fire (Figure 27). A calculation
method is given in the section on Equations for Steady Smoke Exhaust.
Analysis of the design fire is extremely important
for atrium smoke control design, and an understanding of fire development is needed for such
analysis. The intent of this section is to provide preliminary information of these topics. For
more complete information, see Chapter 5 of the Smoke Control
Handbook. By nature, fire is an unsteady process, but many design fires are steady
fires. One of the most important aspects of a design fire is the heat
release rate (HRR). Other fuel properties (e.g., heat of combustion,
soot yield) are not discussed here, because they are not used in the calculations in the
Equation Method for Steady Smoke Exhaust section. However, such fuel properties are needed for
CFD simulations that include tenability analysis.
When steady design fires are based on test data, it is accepted that the HRR of the steady fire
is taken as the maximum HRR of the test data. For example, the HRR of upholstered furniture from
test data is shown in Figure 28. For a sofa,
the HRR grows to a maximum of about 3000 Btu/s, then decreases as the fuel burns
out. A sofa design fire could be unsteady based on the fire test data, or it could be a steady
3000 Btu/s.
A design scenario is an outline of events and conditions that are critical to determining the
outcome of alternative situations or designs. In addition to the fire location and HRR, it may
include many other conditions such as materials being burned, outdoor temperature, wind, status
of the HVAC system, and doors that are opened and closed.
A design analysis should include several design scenarios to ensure that the smoke control system
will operate as intended. It is possible for an atrium project to have only one scenario, but
most projects have two or three, and some complex projects require five or more.
The stages of fire development are useful when discussing fires. These stages are (1) growth, (2)
flashover, (3) fully developed fire, and (4) decay. Not all fires go through all the stages,
primarily because of fire suppression or a lack of fuel. The growth stage follows ignition, and
the early part of the growth stage is characterized by an abundance of air for the fire. During
the growth stage, the fire often spreads from one object to another. The growth stage of a sofa
fire is from ignition to the peak HRR of about 3000 Btu/s. The growth stage is
often characterized by the following equation:
where
| q = heat release rate, Btu/s |
| t = time, s |
| tg = growth time, s |
Such a growth stage is a called a t-squared fire, and typical growth times are listed in
Table 7.
Development of a room fire in the growth stage may seem gradual. Smoke rises above the fire to
form a smoke layer under the ceiling. Typically, the fire spreads from object to object, while
the temperature of the smoke layer increases.
Flashover is a rapid change from a growth-stage fire
to a fully developed fire, and primarily occurs by thermal radiation. This radiation is from the
flames, the smoke plume, and the hot smoke layer below the ceiling. Thin, easy-to-ignite
materials (newspapers, draperies, etc.) near the fire are the first to burst into flame, and
this is followed by ignition of the rest of the flammable materials in the room.
In a room with a fully developed fire, everything that can burn is burning. A fully developed
fire also is called a ventilation-controlled fire,
because the HRR depends on the amount of air that reaches the fire. During a fully developed
fire, flames generally extend from the doorways or open windows of the fire room. A fully
developed fire is characterized by inefficient combustion resulting in high carbon monoxide
production. For a fully developed fire in room with one opening, the HRR within the fire room
can be expressed as
where
| q = heat release rate of fully developed fire,
Btu/s
|
| Aw = area of ventilation opening,
ft2
|
| Hw = height of ventilation opening,
ft
|
For example, a fully developed fire in a room with a single door 3.5 by 7 ft has an
HRR of 3970 Btu/s. The decay stage is a decrease in the HRR, which results from
either fuel consumption or fire suppression. As the fuel is consumed, the fire may change from
ventilation controlled to fuel controlled.
Sprinklers are used extensively because they effectively suppress fires. The possible responses
to sprinkler spray include (1) HRR decay, (2) constant HRR, or (3) an increase in HRR. The first
two responses might be considered successful suppression, but in the third case, the sprinkler
spray is overpowered by the fire.
Sprinkler actuation depends on the temperature and velocity of the gases flowing by the sprinkler
and on the responsiveness of the sprinkler. The responsiveness of a sprinkler is characterized
by the response time index (RTI). In a fire, a
ceiling jet of hot gases flows in a radial direction from where the smoke plume contacts the
ceiling. The RTI of standard-response sprinklers is greater than or equal to 145
ft1/2 · s1/2; fast-response
sprinklers’ RTIs are equal to or less than 90
ft1/2 · s1/2. Computer programs can use
the RTI and correlations for the ceiling jet to predict sprinkler actuation time, and some zone
fire models (including CFAST, discussed in the section on Zone Fire Modeling) have this ability.
In spaces with high ceilings (greater than about 25 or 35 ft), the temperature of
the smoke plume can drop so much that sprinklers may not activate, or activation may be so
delayed that the spray can evaporate before it reaches the fire. Sprinklers in an atrium could
have some beneficial effect, but for design purposes they are considered not effective in an
atrium. However, they are usually considered effective for fires in communicating spaces (i.e.,
a space with an open pathway to an atrium, such that smoke from a fire in either the atrium or
the communicating space can move from one to the other without restriction). Fires in
communicating spaces are often included in design scenarios.
A fire can be shielded from the sprinkler spray if an obstruction is between the sprinkler and
the fire. Not only does the obstruction shield the fire from the water spray, but it also
prevents the usual formation of a smoke plume. Because the smoke plume of a shielded fire can be
very different from that of an unshielded fire, the sprinkler actuation time of shielded fires
must not be calculated by the computer methods mentioned previously.
Two models have been developed for the HRR of shielded fires, based on test data. At NIST, fire
tests were based on a few field observations of fuel loadings in office buildings (Madrzykowski
and Vettori 1992), with a peak HRR of shielded fires of 474 Btu/s. At the National
Research Council of Canada (NRCC), fire tests were based on extensive field observations of fuel
loadings in many buildings (Lougheed 1997), with a peak HRR of shielded fires of 948
Btu/s.
A peak HRR of 948 Btu/s is suggested for most shielded fires, and an HRR of
474 Btu/s for locations where fuel is limited, such as in a showplace office of the
president of a large corporation.
Transient fuels are materials that are in a space temporarily. Examples include seasonal
decorations, paint and solvents in stairwells during redecorating, unpacked foam cups in
cardboard boxes after delivery, cut-up cardboard boxes awaiting removal, upholstered furniture
after delivery, stacked folding chairs, and materials from special events such as parties or
dinners. Sometimes, transient fuels remain in place for long periods: for instance,
polyurethane-filled mattresses delivered to a dormitory and waiting for distribution in the next
school year, automobiles on display in a shopping mall, boats and campers on display in an
arena, and a two-story wood frame house built for display inside a shopping mall.
Transient fuel is likely to accumulate at most locations in a building, except where it would
block the usual paths of heavy traffic. It is unlikely that a commonly used building entrance or
corridor would be blocked by transient fuel, but there could be accumulations next to a wall
near the entrance or in the corridor.
Location can play a key role in transient fuels. Consider a sofa with polyurethane foam padding
that is delivered for the office of the corporate president. Because the sofa is new and clean,
it is decided to temporarily leave it in the nearby atrium until it can be moved to the
president’s office. In a corridor of an office building, the fuel could be trash
consisting of any number of things such as an old upholstered chair or cardboard boxes with
packing materials.
In many atriums, fuel loading is severely restricted with the intent of restricting fire size.
Such atriums are characterized by interior finishes of metal, brick, stone, or gypsum board and
furnished with objects made of similar materials, plus plants. In this chapter, a heat release
rate per floor area of 20 Btu/s · ft2 is used for a
fuel-restricted atrium, and 44 Btu/s · ft2 is used
for atriums containing furniture, wood, or other combustible materials. These heat release rates
per unit floor area are from Morgan (1979) and Morgan and Hansell (1987). In a fuel-restricted
atrium, transient fuels must not be overlooked when selecting a design fire. The minimum fire is
often considered as occupying 100 ft2 of floor area. The HRR of the
minimum transient fire is (20 Btu/s · ft2)(100
ft2) = 2000 Btu/s. The HRR of the minimum fire with combustibles is
(44 Btu/s · ft2) × (100 ft2) = 4400
Btu/s. However, the area involved in fire can be much greater, and large fires can
easily occupy 228 to 570 ft2 of floor area. This translates to large
fires ranging from 10,000 to 25,000 Btu/s. Table 8 lists some steady
design fires, but an engineering analysis as discussed in Chapter 5 of the Smoke Control Handbook can result in different fire sizes. The large
fires in Table 8 are not often
used for design, but they represent an atrium with a large amount of fuel such as many
upholstered sofas and chairs.
Atrium smoke filling is only applicable to very large atriums. Atrium smoke filling time can be
calculated by empirical equations for steady fires and for t-squared
fires in NFPA Standard 92 and Chapter 15 of the Smoke Control Handbook. These equations are based on the conventional
approach of keeping smoke from coming into contact with occupants during evacuation. In very
large atriums, smoke can often be diluted to the extent that a tenable environment is maintained
for some time in the smoke layer at the top of the atrium. Design analysis of atrium filling is
usually done with CFD modeling and tenability analysis (see the section on Tenability Systems).
Loss of Buoyancy in Atriums
For some applications, loss of buoyancy can cause the smoke layer to descend and threaten
occupants. There is little research on this event, but the geometry of the large-volume space
and the fire’s heat release rate are major factors. Spaces that are unusually large or
unusually long are of particular concern; for these cases, draft curtains can divide up the
atrium into several smaller spaces. Theoretically, CFD modeling can predict loss of buoyancy in
a large-volume space, but this has not been experimentally verified.
Minimum Smoke Layer Depth
The ceiling jet and smoke flow under the jet each have a depth of about 10% of the
floor-to-ceiling height. Thus, the minimum smoke layer depth should be 20% of the
floor-to-ceiling height, except when an engineering analysis using full-scale data, scale
modeling, or computational fluid dynamic (CFD) modeling indicates otherwise (see the section on
CFD Modeling). For information about scale modeling and full-scale fire testing, see Chapters 21
and 22 of the Smoke Control Handbook.
Makeup air needs to be provided to ensure that exhaust fans can move the design air quantities
and to ensure that door-opening force requirements are not exceeded. Makeup air can be provided
using fans, openings to the outdoors, or both. Supply points for makeup air need to be below the
smoke layer. Makeup air should be free or nearly free of smoke, as discussed in the section on
Smoke Feedback.
Makeup air can be provided by mechanical fans or openings to the outdoors (e.g., opened doors or
windows). When makeup air is supplied by fans, the makeup air system should be designed to
provide 85 to 95% of the exhaust mass flow rate (not volumetric flow rate). The remaining 5 to
15% of makeup air enters as leakage through cracks in the construction, including gaps around
closed doors and windows. Evaluation of this leakage needs to take energy standards into
account. Makeup air fans can be activated concurrent with smoke exhaust fans, but the flow rate
of makeup air fans should always be less that of the smoke exhaust fans.
When makeup air enters through openings to the outdoors, (1) the mass airflow through these
openings should be considered the same as that of the smoke exhaust, and (2) the openings need
to be opened automatically before the smoke exhaust fans are activated.
Hadjisophocleous and Zhou (2008) and Zhou and Hadjisophocleous (2008) show that, for makeup air
velocities exceeding 200 fpm, the plume can be deflected, resulting in an increase
in smoke production. For even higher velocities, the plume and smoke layer can be disrupted. The
maximum air velocity must not exceed 200 fpm if the makeup air could come into
contact with the smoke plume, unless a higher velocity is supported by engineering analysis. A
secondary reason for the 200 fpm restriction is that it reduces the potential for
fire growth and spread caused by airflow. For systems using fans, the exhaust fans should
operate before the makeup air system does.
A CFD study of makeup air velocity conducted at the University of Maryland supports higher makeup
air velocities higher than 200 fpm, provided that there is an appropriate increase
in smoke exhaust flow rate and that the higher velocity does not increase fire spread or growth
(ASHRAE research project RP-1600; Pongratz et al. 2016). The study examined 950, 2370, and
4740 Btu/s fires. A method of determining the increase in smoke exhaust was
developed, and one of the factors is the height of the makeup air supplied relative to the flame
height.
When makeup air is supplied through openings, the wind can affect makeup air velocity. When
makeup air openings are on walls facing different directions, wind can increase the makeup air
velocity. A simple approach is to have all makeup air openings on walls facing the same
direction. Although many code authorities do not require it, a wind analysis is suggested to
mitigate the possibility of excessive makeup air velocity when makeup air openings are on walls
facing different directions.
Stratification and Detection
A layer of hot air often forms under the ceiling of an atrium because of solar radiation on the
atrium roof. Although no studies have been made of this stratification layer, building designers
indicate that its temperature can exceed 120°F. Temperatures below this layer
are controlled by the building’s heating and cooling system.
When the average temperature of the plume is lower than that of the hot-air layer, a stratified
smoke layer will form beneath the hot-air layer. In this situation, smoke cannot be expected to
reach the atrium ceiling, and smoke detectors mounted on that ceiling cannot be expected to go
into alarm.
Beam smoke detectors can overcome this detection
difficulty. The following approaches can provide prompt detection regardless of air temperature
under the ceiling when a fire begins:
-
Upward-Angled Beam to Detect Smoke Layer.
One or more beams are aimed upward to intersect the smoke layer regardless of the
level of smoke stratification. For redundancy, more than one beam smoke detector is
recommended. Advantages include not needing to locate several horizontal beams, and
minimized risk of false activation by sunlight (a risk with some beam smoke
detectors), because the receivers are angled downward. Review the
manufacturer’s recommendation when using beam smoke detectors for this
application, because some beam detectors are not recommended for upward-angled
installation.
-
Horizontal Beams at Various Levels to Detect Smoke
Layer. One or more beam detectors are located at roof level,
with additional detectors at lower levels. Exact beam positioning depends on the
specific design, but should include beams at the bottom of identified unconditioned
spaces and at or near the design smoke level, with several beams at intermediate
positions.
-
Horizontal Beams to Detect Smoke Plume.
Beams are arranged below the lowest expected stratification level. These beams must
be close enough to each other to ensure intersection of the plume; spacing should be
based on the width of the plume at the least elevation above a point of fire
potential.
All components of a beam smoke detector must be accessible for maintenance, which may require
maintenance openings in walls or the roof depending on the application.
Equation Method for Steady Smoke
Exhaust
This section describes the algebraic equation method for analysis of atrium smoke control systems
with a steady fire. A steady atrium smoke exhaust system has a steady smoke layer interface and
a fire with a constant HRR. The smoke layer interface is an idealized concept described in the
section on Zone Fire Modeling, and the equations used here are used in some zone fire models.
There is some diluted smoke below the smoke layer interface, but this diluted smoke is
considered insignificant. CFD modeling can calculate tenability of this diluted smoke.
For a case study of an engineering analysis for a three-story atrium that uses the algebraic
equations of this section, see Chapter 16 of the Smoke Control
Handbook. This case study addresses (1) the impact of wind, (2) determination of the
minimum smoke layer depth, (3) system activation with a stratified hot-air layer, (4) analysis
of design scenarios, (5) calculation of smoke exhaust for a fire in the atrium, (5) calculation
of smoke exhaust for a fire with a balcony spill plume, (6) determination of makeup air, and (7)
evaluation of the number of exhaust inlets and separation between them to prevent plugholing.
Readers who need to analyze atriums by the equation method may want to use AtriumCalc (Klote
2014), which uses common routines for designing atrium smoke control systems. For example, one
routine calculates the smoke exhaust needed to maintain a steady smoke layer height when there
is a steady design fire in the atrium with an axisymmetric plume. Each routine can be printed on
a page suitable to be inserted in an engineering report. The page consists of a relevant figure,
the equations used for calculation, input, and output. Other routines address balcony spill
plumes, window plumes, preventing plugholing, and opposed airflow.
For an atrium fire, most of the heat flows upward in the smoke plume, and practically the rest of
the heat leaves the fire by radiation. Heat transfer from fires by conduction is negligible. The
convective heat release rate is expressed as
where
| χc = convective fraction |
| qc = convective heat release rate,
Btu/s
|
| q = heat release rate, Btu/s |
The convective fraction depends on the material being burned, heat conduction through the fuel,
and the radiative heat transfer of the flames, but a value of 0.7 is usually used. For fire
reconstruction, the specific value of the fuel being burned must be used.
For a fire in an atrium, the mass flow rate of the plume is usually calculated by the empirical
plume equations for axisymmetric plumes. Theoretically, an axisymmetric plume has a round cross
section, but the plumes of many burning objects behave like an axisymmetric plume at some
distance above the fire.
For a distance above the base of fire z equal to or greater than the
limiting elevation zl, the mass flow of the plume is
For z < zl, the mass flow
of the plume is
where
| m = mass flow in axisymmetric plume at height z, lb/s |
| qc = convective heat release rate of fire,
Btu/s
|
| z = distance above base of fire to smoke layer interface,
ft
|
| zl = limiting elevation, ft |
The limiting elevation is approximately the average flame height, which is
For a burning solid (e.g., chair, sofa, desk), the base of the fire is some distance above the
floor (see Figure 27). When a flammable liquid
has spilled and is burning, the base of the fire is at the floor.
Figures
29 and 30 show
the smoke layer temperature and the smoke exhaust rate for fires in an atrium with an
axisymmetric plume. The mass flow was calculated from the preceding equations, and the smoke
layer temperature and volumetric flow were calculated by equations discussed in the following
sections. As z increases, the smoke layer temperature decreases (Figure
29) as a consequence of air being entrained by the plume as it rises. The plume mass
flow increases with height, and plume temperature decreases with height. Figure
30 shows that as z increases, the smoke exhaust rate
increases.
Example 5.
For a 2000 Btu/s fire in an atrium with a distance from the base of the fire
to the smoke layer interface of 36 ft, what is the mass flow of the plume?
The parameters are: q = 2000 Btu/s, z = 36 ft, and χc = 0.7.
The limiting elevation is
Because z is greater than zl, the mass flow of the plume is calculated with
the following equation:
Fire in Communicating Space
For a fire in a communicating space, usually the mass flow rate of the plume is calculated by
balcony spill plume equations. The following equations are based on extensive research,
including scale model fire experiments, full-scale fire experiments, and analytical studies (Ko
et al. 2008; Law 1986; Lougheed and McCartney 2008a, 2008b; Lougheed et al. 2007; McCartney et
al. 2008; Morgan and Marshall 1979).
The equations were developed for fire room and balcony geometry similar to that of Figure
29. If the geometry is different, CFD modeling is recommended. For plume height zb less than 50 ft above the balcony edge, the
mass flow of the plume is
Note: the mass flow equations and regions of applicability for the
equations listed here have been corrected. NFPA issued errata correcting balcony spill plume
equations in NFPA Standard 92-2012. There is an erratum for the
bounds of one of these equations in the Smoke Control Handbook.
For zb ≥ 50 ft and plume width of less
than 32.8 ft, mass flow of the plume is
For zb ≥ 50 ft and plume width between
32.8 and 45.9 ft, the mass flow of the plume is
where
| m = mass flow rate in plume, lb/s |
| q = heat release rate, Btu/s |
| qc = convective heat release rate of fire,
Btu/s
|
| W = width of the spill, ft |
| zb = height of plume above balcony edge,
ft
|
| H = height of balcony above fuel, ft |
Physical barriers can be used to restrict the horizontal spread of smoke under the balcony. Draft
curtains used for this application must extend at least 10% of the floor-to-ceiling height below
the balcony. In almost all U.S. and Canadian applications, there are no draft curtains to
restrict flow as shown in Figure 31. Without draft curtains, the
spill width is estimated as
where
| W = width of spill, ft |
| w = width of opening from area of origin, ft
|
| b = distance from opening to balcony edge, ft
|
Example 6.
For a 948 Btu/s shielded fire in a communicating space as shown in ,
calculate the mass flow of the balcony spill plume. There are no draft curtains to
restrict the smoke flow under the balcony. The parameters are q = 948 Btu/s, zb = 26 ft, H = 11 ft, b =
6 ft, and w = 13 ft.
The width of the spill is
Because zb is less than 50 ft, Equation
(23) is used to calculate the mass flow of the balcony spill plume:
The smoke layer temperature is calculated from
where
| Ts = smoke layer temperature, °F
|
| To = ambient temperature, °F
|
| K = fraction of convective heat release contained in smoke
layer |
| qc = convective heat release rate,
Btu/s
|
| Cp = specific heat of plume gases, 0.24
Btu/lb · °F |
| m = mass flow rate of plume where it enters smoke layer,
lb/s
|
Equation (27)
applies to both axisymmetric plumes and balcony spill plumes. For atrium smoke control systems,
it is believed that K varies from 0.5 to 1.0. For calculating the
volumetric flow rate of smoke exhaust with Equation (23), use K = 1.0 because it
results in the highest smoke exhaust, which is conservative. For plugholing calculations (see
the following section on Number of Exhaust Inlets), use K = 0.5
because it results in the largest number of exhaust inlets, which is also conservative. Other
values of K may be used for these applications if they are supported
by test data or an engineering analysis. The mass flow rate is calculated from Equations (20) or (21).
Volumetric Flow of Smoke Exhaust
Volumetric flow of smoke exhaust is
where
| V = volumetric flow rate of smoke exhaust, cfm
|
| m = mass flow rate of smoke exhaust, lb/s |
| ρ = density of smoke, lb/ft3 |
The density of smoke can be calculated from
where
| ρ = density of smoke, lb/ft3 |
| patm = atmospheric pressure,
lb/in2
|
| R = gas constant, 53.34
lbf/lbm · °R |
| Ts = absolute temperature of smoke,
°R
|
The standard atmospheric pressure patm for many locations
is provided in Chapter 2 of the Smoke Control Handbook.
Example 7.
What is the volumetric flow rate for the mass flow rate from Example 5? A few minutes
after system activation, the air temperature in the atrium is the same as that of the
outdoors, and the largest volumetric flow rate happens during summer when it is hot
outdoors. The summer outdoor design temperature is 95°F. The parameters
are To = 95°F, m = 102.5 lb/s, qc = 1400 Btu/s, Cp = 0.24, R = 53.34
lbf/lbm · °R, and patm = 14.7 psi. For calculation of
smoke exhaust, K = 1.
When the flow rate of a smoke exhaust inlet is relatively large, cold air from the lower layer
can be pulled through the smoke layer into the smoke exhaust. This phenomenon is called plugholing. Multiple exhaust air inlets may be needed
to prevent plugholing. The maximum volumetric flow rate that can be exhausted by a single
exhaust inlet without plugholing is calculated by
where
| Vmax = maximum volumetric flow rate without
plugholing at Ts, cfm |
| Ts = absolute temperature of smoke layer,
°R
|
| To = absolute ambient temperature,
°R
|
| d = depth of smoke layer below lowest point of exhaust
inlet, ft |
| γ = exhaust location factor |
The ratio d/Di should be
greater than 2 where Di is the diameter of the exhaust
inlet. For exhaust inlets centered no closer than 2Di
from the nearest wall, γ = 1 should be used; for less than 2Di, γ = 0.5 should be used. For exhaust inlets on a
wall, use γ = 0.5. For rectangular exhaust inlets, calculate Di as
where
| a = length of the inlet, ft |
| b = width of the inlet, ft |
The variables a and b can be in any unit
of length provided that they are both in the same units. For square inlets, Di equals the side of the square. Where multiple inlets are
needed to prevent plugholing, the minimum separation between inlets should be
where
| Smin = minimum edge-to-edge separation between
inlets, ft |
| Ve = volumetric flow rate of one exhaust inlet,
cfm
|
Example 8.
For the fire of Example 7, determine the number of smoke exhaust inlets and the minimum
separation between them to prevent plugholing. The smoke layer is 10 ft
deep. Because the inlets in the ceiling are far from walls, γ = 1. Plugholing will
be calculated for an ambient temperature of 70°F. The parameters are
γ = 1, d = 10 ft, To = 70°F (530°R), m = 102.5 lb/s, qc = 1400 Btu/s, Cp = 0.24, and V = 94,800 cfm. For calculating the number of
exhaust inlets, K = 0.5.
V/Vmax is
94,800/33,100 = 2.9. This means that at least three inlets are needed to
prevent plugholing.
An inlet velocity of 1500 fpm is chosen. The area of each inlet is
31,600/1500 = 21.1 ft2.
An inlet size of 4.5 by 4.7 ft is chosen, and Di = 2ab/(a + b) = 2(4.5)(4.7)/(4.5 +
4.7) = 4.6 ft.
Then d/Di =
10/4.6 = 2.17, which meets the stipulation that this ratio has to be
greater than 2.
These calculations indicate that the edges of the inlets need to be at least 11.6
ft apart from each other, and at least 2Di (2 × 4.6 = 9.2 ft) from the
nearest wall. If the edges of any inlets are closer to a wall, the calculations should
be repeated with γ = 0.5. If the inlets were in the walls, γ would be 0.5.
Zone fire modeling is a simple approach to simulating smoke transport. The idea of the zone fire
model came from observations in early room fire experiments that a smoke plume rises above the
fire, and a smoke layer forms under the ceiling. As the fire continues, the smoke layer
descends, and smoke may flow out of doorways (a doorjet).
A zone fire model considers a fire compartment to be made up of an upper smoke layer and a lower
nonsmoke layer. The mass flows of the smoke plume and the doorjet are calculated from empirical
equations. For the zone model idealization, temperature and concentrations of constituents are
considered to be constant throughout each layer. These properties change only as a function of
time.
Most zone models consider that ceilings are flat and that rooms have uniform cross-sectional
areas. The height of the discontinuity between these layers (the smoke layer interface) is considered to be the same
everywhere. In the idealized model at an infinitesimal distance above the interface, the
temperature and contaminant concentrations are those of the smoke layer. At an infinitesimal
distance below the interface, the temperature and contaminant concentrations are those of the
lower layer. Even with these simplifications, zone fire models have proven to be very useful
tools for many applications, but they must be used with care. Because different zone models use
different empirical equations implemented in different ways, the predictions of different zone
models vary to some extent.
Many zone models were developed in the 1980s, and often had poor numerical convergence. CFAST is a multiroom zone fire model that has superior
numerical convergence, many features, and a graphical interface (Peacock et al. 2017), and has
been verified with full-scale fire data. CFAST and its documentation are available from NIST at
no cost from pages.nist.gov/cfast.
Probably for these reasons, CFAST has become the de facto
standard zone fire model.
CFAST can be used to simulate atrium smoke filling, and is useful for calculating sprinkler
activation time. To help new users of this model get started, Chapter 18 of the Smoke Control Handbook has general information about zone models plus
some CFAST user information.
Atrium smoke control can be analyzed by CFD modeling. For general information about CFD modeling, see Chapter 13
of the 2021 ASHRAE Handbook—Fundamentals. For information
about fire applications of CFD modeling, see Chapter 20 of the Smoke
Control Handbook.
The idea of CFD is to divide the space of interest into a large number of cells and to solve the
governing equations for each cell. Often, millions of cells are necessary for atrium
applications. The number of cells in the model should be large enough to simulate airflows
around modeled obstructions faithfully, and this can be evaluated by a sensitivity analysis of
cell size. Obstructions such as walls, balconies, and stairs should be taken into account, and
conditions at the boundaries defined. Exhaust flow at or near the top of the atrium is
specified, and makeup air conditions are also defined. This allows simulation of fluid flow in
considerable detail.
Although CFD modeling has significant advantages in realistically simulating smoke flow, it is
computationally intensive and requires a lot of computer memory and time; it is not uncommon for
a CFD simulation to run for many hours and sometimes days. CFD produces so many numbers that
graphical methods are needed to understand both general trends in the atrium and nuances in
localized conditions.
Several general-purpose CFD models are commercially available that can be used for atrium smoke
control. NIST has developed the Fire Dynamics Simulator (FDS) model (McGrattan et al. 2019) with
visualization software called Smokeview (Forney 2019). FDS, specifically developed and verified
for fire applications, can be obtained from NIST at no cost (pages.nist.gov/fds -smv/) and has
become the de facto standard CFD model for fire applications.
16. COMMISSIONING AND TESTING
The commissioning and testing discussed in this section applies to smoke control systems.
Commissioning refers to the process of examining,
comparing, testing, and documenting the installation and performance of a smoke control system to
ensure that it functions according to an approved design. It demonstrates to an owner that the smoke
control system installed in a project meets the project’s design goals.
Special inspections are a means that an authority having jurisdiction
(AHJ) uses to determine that a smoke control system meets the code
requirements. The International Building Code (IBC) has requirements for a special inspection and
describes the qualifications required for a special inspector (ICC 2012).
Commissioning begins at the start of the project and continues throughout the project. ASHRAE
Guideline 1.5 provides methods for verifying and documenting that
the performance of smoke control systems conforms with the intent of the design. For smoke
control systems, an AHJ such as a building official or fire marshal typically enforces a
combination of building codes, fire codes, and local standards. The intent is to determine that
the system meets the owner’s project requirements (OPR), including code requirements and
inspections by the AHJ throughout the delivery of the project.
Witnessing and reporting are important parts of commissioning. For successful commissioning of a
system, several different people typically are involved in the process. In addition to the
building owner and AHJ, the system designer, general contractor, subcontractors, fire protection
engineering consultants, and testing and balancing technicians can be involved. At the end of
testing, documentation is provided that the system is working properly according to the design.
Commissioning activities can occur at multiple stages during the construction process. Duct
inspections, duct leakage testing, and barrier inspections are activities that typically occur
early in the construction process when the ducts and barriers are readily visible. Component
testing, including airflow measurement, can occur at a midpoint in construction where power is
provided to individual devices, but central monitoring and control has not yet been provided.
Sequence of operations and final performance testing typically occurs when construction is
nearly complete, often just before the building is intended to obtain its permits and open to
the public.
Commonly, testing and balancing (TAB) is required before formal acceptance testing
to achieve the expected performance of all the components. TAB refers to the process where the
as-built performance of smoke control systems is tested in the field and compared to the
required design conditions. Adjustments to the installed system, such as refining the supply
airflow rates, are made to ensure that the smoke control system is functioning as intended in
the approved design documentation.
System performance testing is the phase where the code-specified performance parameters
appropriate to the smoke control design are measured. For example, building codes require that a
minimum pressure difference exist between a pressurized stairwell and other zones in the
building, and that door-opening force must not exceed a specified amount. In this case,
performance testing would focus on measuring the pressure difference across stairwell doors and
door-opening forces. Some common parameters measured during smoke control system performance
testing are (1) exhaust/supply airflow quantities, (2) airflow velocities at atrium or other
large open space perimeters, (3) door-opening forces, and (4) pressure differences between
zones.
Caution: Smoke Bomb Tests Not Recommended. Artificial
smoke from smoke bombs (also called smoke candles) or any kind of artificial smoke generator is
not recommended for any performance testing, because it lacks the buoyancy of hot smoke from a
real building fire. Smoke near a flaming fire has a temperature in the range of 1000 to
2000°F. Heating chemical smoke to such temperatures to emulate smoke from a real
fire is not recommended unless precautions are taken to protect life and property.
Some building codes require special inspections and tests of smoke control systems in addition to
the ordinary inspection and test requirements for buildings, structures, and parts of buildings.
These special inspections and tests should verify the proper commissioning of the smoke control
design in its final, installed condition. Procedures for inspection and testing should be
developed by the smoke control system’s special inspector, with approval of the
authorities having jurisdiction. The special inspector must understand the principles of smoke
control, including code requirements, and should check that the system’s components are as
specified and are installed as intended, as well as whether the smoke control system performs as
intended.
Periodic tests should be conducted at the frequency specified in the test plan. Where there are
no code requirements for periodic testing, the use of the requirements for periodic testing of
the International Fire Code (IFC) (ICC 2018b) are suggested. The IFC requirements are
-
Dedicated smoke control systems be operated and tested for each control sequence
semiannually, and
-
Non-dedicated smoke control systems be operated and tested for each control sequence
annually.
These tests are to be with normal power and standby power conditions. These requirements are
consistent with those in NFPA 92.
A dedicated smoke control system and its components are installed for the sole purpose of
providing smoke control, and upon activation these systems operate specifically to perform the
smoke control function. Typically, pressurized stairwells, pressurized elevators and fan-powered
atrium smoke exhaust are dedicated systems.
A non-dedicated smoke control system is one that shares components with another system or
systems, and the most common non-dedicated system is zoned smoke control that uses HVAC system
components (fans, ducts, and dampers). Some zoned smoke control systems are dedicated systems.
The logic behind testing dedicated systems semiannually is that periodic testing can be done in
the spring and fall with the intent of not forcing hot summer or cold winter air into building
spaces. Forcing hot or cold air into an occupied space can increase heating/cooling costs, be
uncomfortable to occupants, and adversely affect living plants. The logic behind testing
non-dedicated systems less often is that problems are more likely to be detected by building
occupants and facility staff who notice a failure in the HVAC system or some other system that
is used regularly.
The periodic tests should determine the airflow quantities and pressure differences at the
following locations: (1) across smoke barrier openings, (2) at the air makeup supplies, and (3)
at smoke exhaust equipment. All data points need to coincide with the acceptance test location
to facilitate comparison of measurements.
The system should be tested by persons who are thoroughly knowledgeable in the operation,
testing, and maintenance of the systems. The smoke control system needs to be operated for each
sequence in the current design criteria. The operation of the correct outputs for each given
input needs to be observed. Tests are to be conducted under primary and standby power as
applicable.
The results of the periodic tests should be documented in the operations and maintenance log and
made available for inspection.